Construction Inspector, Parsons, Pasadena, CA. 2003 — 2011. John provided inspection for a $2.113
<br />Program Management Joint Venture for Orange County Sanitation District that involved the following:
<br />• Rocky Point Pump Station, Mar. 2010 — Jul. 2011. This $84M project constructed a replacement
<br />pump station at the existing Rocky Point Pump Station in Newport Beach, CA. The discharge force
<br />mains from the facility were reconstructed by using trenchless technologies (jack and bore) and
<br />open -trench methods.
<br />• Westside Pump Station, Oct. 2009 — Mar. 2010. This $6.5M project rehabilitated the existing
<br />Westside Pump Station and increased the station's capacity to meet current and projected peak wet -
<br />weather flows. The project consisted of construction of a separate access stairwell to the lower
<br />section of the pumping station, replacement of the pumps and controls, and modification of
<br />ventilation systems.
<br />• Carbon Canyon Dam Sewer and Pump Station Abandonment, Aug. 2008 — Oct. 2009. This $5.4M
<br />project included construction of 4,970 feet of 24-inch to 42-inch VCP and Fiberglass sewer pipelines
<br />using conventional open -cut construction and micro tunneling technologies; demolition of the
<br />existing pump station, abandonment of the existing sewer and force mains, and completion of
<br />additional earthwork. It involved coordination with several project stakeholders (County of Orange
<br />Public Works, State Parks, California Department of Fish and Game, U.S. Army Corps of Engineers,
<br />Aera Energy, and other private local businesses). At the beginning of the project, John inspected the
<br />excavation of the launching and receiving pit along with the Beam and Plate shoring at the launching
<br />pit. He worked closely with the operator of MTBM taking reports daily on the length of the run and
<br />any elevation changes.
<br />• Gisler-Redhill Trunk Sewer Construction, City of Tustin, CA. Jan. 2005 —Jun. 2007. John was actively
<br />involved in resolving construction issues, processing change orders, and coordinating with project
<br />stakeholders. This $27M project included construction of approximately 38,170 feet of 27-inch to
<br />12-inch Vitrified Clay Pipe, 15- to 25-ft deep, within the City of Tustin and Unincorporated Areas of
<br />the County of Orange.
<br />• Sunflower Interceptor Manhole Rehabilitation, City of Costa Mesa, CA. Nov. 2005 — Sep. 2006.
<br />The project included construction of two jacked steel casings (jack and bore) under local storm drain
<br />channels.
<br />• Effluent Pump Station Annex OCSD Plant 2 Huntington Beach, CA. John's responsibilities included
<br />inspection of the excavation and installation of the Beam and Plate shoring system along with 700
<br />feet of 144-inch Steel Mortar Lined pipe with a T-Lock lined interior.
<br />Construction Inspector, Talbert Barrier West End Improvement Project, Orange County Water
<br />Department, Daniel Boyle Engineering, Inc. Laguna Hills, CA. Construction Inspector for two groundwater
<br />injection well sites with three wells each, 2,500 feet of 36-inch DIP injection supply line, 3,000 feet of 30-
<br />inch DIP injection supply line.
<br />City of Torrance, CA: 3,000 feet of 12-inch DIP plus jack and bore under storm drain, 1,000 feet of 8-inch
<br />DIP, 40 new water services, 6 new fire hydrants, pressure testing, and chlorinating of new water main.
<br />Long Beach Water Department: 1,000 feet of new 12-inch DIP water main, 12 new water services, 8 water
<br />laterals. Long Beach Boulevard Cherry Avenue: 6,000 feet of 12-inch TR Flex ductile iron water main, 20 tie-
<br />in laterals, 25 6-inch fire hydrants laterals plus gate valves, 25 12-inch gate valves, concrete replacement
<br />of Long Beach Boulevard and cold planning of Cherry Avenue with asphalt cap. 2,000 feet of 24-inch CMLCC.
<br />Orange County Sanitation District: 2,000 feet of 18, 10, 12, 15-inch VCP, three 60-inch PVC -lined
<br />manholes, spark testing on PVC manholes, air test 2,000 feet of VCP, ball 2,000 feet of sewer. Review all
<br />Dig Alert tickets and mark all sewer and force mains belonging to OCSD.
<br />Berg & Associates Inc.
<br />
|