Construction Inspector, Parsons, Pasadena, CA. 2003 — 2011. John provided inspection for a $2.113 <br />Program Management Joint Venture for Orange County Sanitation District that involved the following: <br />• Rocky Point Pump Station, Mar. 2010 — Jul. 2011. This $84M project constructed a replacement <br />pump station at the existing Rocky Point Pump Station in Newport Beach, CA. The discharge force <br />mains from the facility were reconstructed by using trenchless technologies (jack and bore) and <br />open -trench methods. <br />• Westside Pump Station, Oct. 2009 — Mar. 2010. This $6.5M project rehabilitated the existing <br />Westside Pump Station and increased the station's capacity to meet current and projected peak wet - <br />weather flows. The project consisted of construction of a separate access stairwell to the lower <br />section of the pumping station, replacement of the pumps and controls, and modification of <br />ventilation systems. <br />• Carbon Canyon Dam Sewer and Pump Station Abandonment, Aug. 2008 — Oct. 2009. This $5.4M <br />project included construction of 4,970 feet of 24-inch to 42-inch VCP and Fiberglass sewer pipelines <br />using conventional open -cut construction and micro tunneling technologies; demolition of the <br />existing pump station, abandonment of the existing sewer and force mains, and completion of <br />additional earthwork. It involved coordination with several project stakeholders (County of Orange <br />Public Works, State Parks, California Department of Fish and Game, U.S. Army Corps of Engineers, <br />Aera Energy, and other private local businesses). At the beginning of the project, John inspected the <br />excavation of the launching and receiving pit along with the Beam and Plate shoring at the launching <br />pit. He worked closely with the operator of MTBM taking reports daily on the length of the run and <br />any elevation changes. <br />• Gisler-Redhill Trunk Sewer Construction, City of Tustin, CA. Jan. 2005 —Jun. 2007. John was actively <br />involved in resolving construction issues, processing change orders, and coordinating with project <br />stakeholders. This $27M project included construction of approximately 38,170 feet of 27-inch to <br />12-inch Vitrified Clay Pipe, 15- to 25-ft deep, within the City of Tustin and Unincorporated Areas of <br />the County of Orange. <br />• Sunflower Interceptor Manhole Rehabilitation, City of Costa Mesa, CA. Nov. 2005 — Sep. 2006. <br />The project included construction of two jacked steel casings (jack and bore) under local storm drain <br />channels. <br />• Effluent Pump Station Annex OCSD Plant 2 Huntington Beach, CA. John's responsibilities included <br />inspection of the excavation and installation of the Beam and Plate shoring system along with 700 <br />feet of 144-inch Steel Mortar Lined pipe with a T-Lock lined interior. <br />Construction Inspector, Talbert Barrier West End Improvement Project, Orange County Water <br />Department, Daniel Boyle Engineering, Inc. Laguna Hills, CA. Construction Inspector for two groundwater <br />injection well sites with three wells each, 2,500 feet of 36-inch DIP injection supply line, 3,000 feet of 30- <br />inch DIP injection supply line. <br />City of Torrance, CA: 3,000 feet of 12-inch DIP plus jack and bore under storm drain, 1,000 feet of 8-inch <br />DIP, 40 new water services, 6 new fire hydrants, pressure testing, and chlorinating of new water main. <br />Long Beach Water Department: 1,000 feet of new 12-inch DIP water main, 12 new water services, 8 water <br />laterals. Long Beach Boulevard Cherry Avenue: 6,000 feet of 12-inch TR Flex ductile iron water main, 20 tie- <br />in laterals, 25 6-inch fire hydrants laterals plus gate valves, 25 12-inch gate valves, concrete replacement <br />of Long Beach Boulevard and cold planning of Cherry Avenue with asphalt cap. 2,000 feet of 24-inch CMLCC. <br />Orange County Sanitation District: 2,000 feet of 18, 10, 12, 15-inch VCP, three 60-inch PVC -lined <br />manholes, spark testing on PVC manholes, air test 2,000 feet of VCP, ball 2,000 feet of sewer. Review all <br />Dig Alert tickets and mark all sewer and force mains belonging to OCSD. <br />Berg & Associates Inc. <br />