My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - SR-55/Ritchey Street Water Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
11/02/2021 Regular and Special
>
Item 13 - SR-55/Ritchey Street Water Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 10:45:54 AM
Creation date
8/17/2023 8:28:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
11/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-STE <br />Dave Valerio, CWI, NACE <br />Senior Inspector -Inspector <br />Senior Inspector, CWI inspector IDE-Poseidon Resources -Provides site welding <br />inspection of stainless -steel SMO 254 specialty fittings associated with emergency repair <br />of 6"-14" diameter piping; duties included welder qualification testing, welding inspection <br />documentation of each weld segment calculating travel speed and heat input for strict <br />conformance with WPS requirements. <br />• Claude "Bud" Lewis Carlsbad Desalination Plant <br />Senior Inspector, CWI inspector OTAY MWD-As Needed Inspection Services -As Senior <br />Inspector provides in plant fabrication welding inspection of Large Diameter pipe, <br />specialty fittings and related NACE coating inspection for the following Projects; duties <br />included welding inspection, hydro testing, and welder qualification testing: <br />• Otay Crossings Commerce Park Tract 5405-1 <br />• Western Waterworks-Otay Ranch -Village 3, Heritage Road <br />Fabrication Inspector - CWI & NACE I Coating Specialist (Los Angeles World Airport) <br />Performs fabrication Quality Assurance services of large diameter pipe, mechanical <br />equipment, structural steel, stairs, railings, ductile iron pipe, concrete reinforced pipe, <br />valves, roof joists, transformers, switchgear, HVAC, VFD, PLC, electric circuits, mechanical <br />systems, hydraulics and cast iron floor hatches, glass supported railing, modular air <br />handling units, fixed walk ways. <br />• The Southside Runway Improvements Project <br />QC Supervisor NOV AMERON INTERNATIONAL WATER TRANS GROUP WIND TOWER <br />DIV. FONTANA, CA <br />Duties included the destructive and non-destructive testing of materials used in the <br />manufacture of large diameter cement, tape and epoxy lined, and coated steel pipe up to <br />196" in diameter. Examples include, but are not limited to Visual weld inspection, <br />magnetic particle, dye penetrant, hardness, tensile and bend testing of welds and steel. <br />Compression, moisture absorption, and batch moisture content testing of cement linings <br />and coatings. Performed Physical testing of cold applied plastic tape and epoxy coatings, <br />duties included thickness verification and adhesion testing for various tape and epoxy <br />coatings; aided in the development and implementation of the ISO 9002 Quality <br />Management System. <br />Meet with the Project Representative or Client to review the requirements of the contract <br />specifications and any codes or standards that may be applicable. Supervise the QC <br />Technicians on the shop floor and help in training and advising them of methods and <br />techniques. Review the specifications and help in establishing hold points and third party <br />witness points. Help in establish the extent and methods of NDE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.