My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Engineering and Traffic Survey for Speed Limits Updates
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
10/19/2021 Regular and Special
>
Item 17 - Engineering and Traffic Survey for Speed Limits Updates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:00:05 AM
Creation date
8/17/2023 8:47:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
10/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />E&TS) and the 2020 California Manual for Setting Speed Limits (basis for the 2021 E&TS), if <br />any. It will be submitted to the City for review. <br />As specified in the RFP, at a minimum, the report will include the following: <br />• Radar speed survey operational procedures <br />• Description of the purpose and methodology of Speed Zone establishment, including a <br />discussion of realistic speed zoning, speed traps, CVC requirements, etc. <br />• Description of the statistical analysis factors <br />• Description of the field data used in analyzing related roadway characteristics <br />• Accident history for the street segments <br />• Results and recommendations <br />• Summary of recommendations in narrative and table form per City format <br />• Revision drafts to the City of Santa Ana Municipal Code establishing the new speed <br />limits <br />• Color Speed Survey Map — sample provided in Appendix G. <br />The report will be a legal document to formally adopt or change speed limits at the surveyed <br />locations. <br />Task 7 — Preparation of Final Report <br />AGA will address and incorporate the City's consolidated comments on the draft report into the <br />final report which will be provided to the City in both hardcopy and electronic formats. <br />Task 8 — Presentations <br />AGA will make up to five presentations at public meetings to report on the E&TS study findings <br />and recommendations. Mr. Perales, Engineer of Record, will make the presentation(s) and <br />answer any questions that come up. <br />Task 9 — Sketches for Sign Changes (Optional) <br />If directed by the City, AGA will survey and document the status of existing speed limit <br />sign/posts at up to 90 locations that may require modifications. AGA's tasks will include: <br />• Identify each proposed new sign location at a specific distance from the nearest curb <br />extension, <br />• Indicate if the sign is new, a replacement, and/or removal, <br />• Indicate if a new sign only or new sign and post will be required, and <br />• Prepare sketches depicting the above information. <br />The sketches will be developed by AGA in a manner acceptable to the City and using City <br />formats as described in the RFP, i.e., the sketches will be developed by inserting electronic <br />aerial photos into the Microstation-compatible files and showing the sign posting changes from <br />the nearest curb return extension. AGA has performed this task on several previous speed <br />survey projects, including the ones completed for the City of Santa Ana. <br />Eng[..—, Inc. Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.