My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Local Street Curb Ramp Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 28 - Local Street Curb Ramp Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 8:46:44 AM
Creation date
8/17/2023 11:59:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
28
Date
12/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Street Curb Ramp Improvements <br />December 7, 2021 <br />Page 3 <br />implementation of the City's Community Workforce Agreement requirements; inspection <br />of the Contractor's work to ensure contract compliance, workmanship, and quality; and <br />materials testing. As indicated in the Cost Analysis (Exhibit 5) and as summarized in the <br />table below, the estimated total construction delivery cost of the project is $554,582. The <br />construction bids came in lower than anticipated. The contingency is higher to take <br />advantage of these lower costs and to maximize the allocation of CDBG funding as well <br />as to account for unknown and unanticipated conditions. This will allow additional curb <br />ramps to be completed beyond the anticipated scope. <br />Project Item <br />Total <br />Construction Contract <br />$299,090.00 <br />Construction Administration, Inspection, Testing <br />$44,863.50 <br />Contingencies <br />$210,628.50 <br />TOTAL CONSTRUCTION DELIVERY COST IF$554,582.00 <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2021-114 was filed for the project. <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br />project is $554,582 which includes construction, contract administration, inspection, <br />testing, and an authorized contingency. Funds for this project were appropriated in Fiscal <br />Year 2021-22 and are available for expenditure. Any remaining balances not expended <br />at the end of the fiscal year will be carried forward into FY 2022-23 for expenditure. Project <br />No. 22-7537 is the number assigned to the Project Plans and Specifications and the <br />Notice Inviting Bids. <br />The following table summarizes the funds budgeted and available for expenditure to <br />deliver construction of this project. <br />Accounting Unit <br />Fund <br />Accounting Unit - <br />r <br />Year ea <br />- Account No. <br />Description <br />Account No. <br />Amount <br />(Project No.) <br />Description <br />13518783- <br />Community <br />CDBG Program — <br />2021-22 <br />66220 <br />Development <br />Improvements Other <br />$554,582.00 <br />(22-7537) <br />Block Grant <br />Than Buildings <br />Total <br />$554,582.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.