Laserfiche WebLink
1.5.1 All equipment shall be permanently affixed and accessible for maintenance and <br />operation in accordance with all code requirements. Supports for all equipment shall <br />conform to seismic requirements for intended location of installation. <br />1.5.2 The Supplier shall notify the City's Representative no later than 10 working days prior to <br />factory testing of the compressor systems to allow the City Representative the option to <br />witness the test prior to shipment. Witnessing of the testing does not relieve the <br />manufacturer of the responsibility to comply with the specifications. <br />1.5.3 All paint and priming products, whether shop or field applied, shall be lead, chromium, <br />and cadmium free. In addition, these products and all other materials used shall comply with <br />local, regional, state and federal air quality rules and regulations, especially thoseof the <br />South Coast Air Quality Management District. <br />1.5.4 All materials and exposed surfaces subject to corrosion, shall receive a two -coat shop - <br />applied paint system. <br />1.5.5 Equipment furnished shall be factory inspected and certified by a National Recognized <br />Testing Laboratory approved by local authority having jurisdiction for compliance with <br />NFPA 70. Certification shall be evidenced by a written report and the application of a <br />sticker on the equipment by the third -party inspection firm. <br />1.5.6 Deviations: Compliance with the provisions of this specification is the vendor's <br />responsibility. Any deviation from this specification, or any of its provisions, shall be <br />clearly identified in the vendors bid. <br />1.6 Qualifications <br />1.6.1 Manufacturer: Company specializing in manufacturing and packaging products and <br />equipment specified in this section with minimum of five (5) years documented <br />experience. <br />1.6.2 References: On company letterhead, provide references for at least (5) projects of <br />similar size and complexity completed within the last five (5) years. State years of <br />experience as described in Part 1.5-A. Include company name, address, primary <br />contact's name and phone number, date completed, and approximate value of the <br />contract. One paae per project. <br />1.7 GENERAL DESIGN CONDITIONS <br />1. Electrical power supplied to the system will be 480 VAC ± 10%, 3-phase, 60 hertz, <br />unless noted otherwise. Power will be provided from an existing power distribution <br />panel located approximately 100 feet from the equipment. <br />2. Natural Gas: PSE form from gas company will be provided when available from <br />Southern California Gas Company. <br />City of Santa Ana - RFP 20-095 <br />CNG Fuel Station: Design, Build, Operate and Maintain <br />15 <br />