My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Natural Gas Fueling Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 22 - Natural Gas Fueling Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:47:29 AM
Creation date
8/17/2023 4:03:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.8 GENERAL PRODUCT REQUIREMENTS <br />A. Sufficient access shall be provided to perform major work on the equipment, including <br />the removal of driver. All electric panels shall have the necessary clearances in front of <br />openings as required by code. Sufficient access may be provided by removal of all or <br />part of the enclosure. <br />B. System shall be sized to provide the total specified gas flow with a single compressor. <br />C. All furnished equipment shall be new. All equipment shall comply with all provisions of <br />this specification including warranty requirements. <br />D. The skid assembly shall comply with design requirements of appropriate sections of <br />CBC. <br />E. The skids shall have bolt holes to facilitate mounting of anchor bolts to a concrete <br />foundation, and provisions for lifting. <br />F. Structural steel skids shall be of welded construction. <br />G. INSTRUMENTATION AND CONTROLS <br />Pressure Gauges: <br />• All gauges shall read at least 1.2 times the system design pressure (NFPA 52). <br />• Accuracy, including hysteresis, shall± 1.5% of full scale or better. <br />• Rear blowout protection shall be provided. <br />• All gauges shall be waterproof and oil -filled. <br />• The dial shall have a minimum diameter of 2-1/2 inches. <br />2. Temperature Gauges (not required if RTDs or TCs are into PLC's HMI): <br />• Accuracy shall be within 1 % of the full scale or better. <br />• The Dial shall have a minimum diameter of 2-1/2 inches. <br />3. All instrument components interfacing with natural gas shall be made of material <br />compatible with odorized natural gas. No copper metal or alloys containing more <br />than 70% copper shall be used in natural gas service. <br />4. All gauges and frequently operated manual valves shall be located no higher than <br />seven (7) feet above grade and shall be easily operable and viewable. <br />H. PIPING/ TUBING <br />City of Santa Ana - RFP 20-095 <br />CNG Fuel Station: Design, Build, Operate and Maintain <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.