My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Natural Gas Fueling Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 22 - Natural Gas Fueling Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:47:29 AM
Creation date
8/17/2023 4:03:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. All filters and vessels shall be equipped with an automatic or manual blowdown <br />valve and a drain line or hose routed the edge of the skid if not readily accessible. <br />3.0. Enclosure <br />A. A totally enclosed weatherproof and sound -attenuating enclosure shall be provided for <br />the compressor assembly, and ancillary equipment in accordance with the following <br />requirements: <br />B. Materials: All materials used shall be non-combustible or fire -rated materials. The <br />enclosure shall be of welded steel construction. The enclosure base frame shall be <br />fabricated of minimum 8 "channel and/or I- beam. Walls and roof material shall be <br />heavy gauge steel for rigidity. Roof material shall be a minimum # 16-gauge steel. <br />C. The enclosure shall have lockable steel doors to provide access to equipment for <br />routine maintenance and inspections. The base frame shall be designed for the <br />mounting of removable equipment assemblies. Plate walkway shall be provided. All <br />interior floor areas, which are large enough to stand on, are to be covered with anti- <br />skid floor plate. Anti-skid floor plates shall be removable, if necessary, for <br />maintenance access. The roof shall be pitched for water run-off. A gauge panel <br />viewing window shall be provided in the enclosure door or wall for the viewing of <br />instruments without opening or entering the enclosure. All piping, and electrical <br />connections shall be provided on the rear of the enclosure. <br />D. Sound Attenuation: If necessary, all walls and roof of the compressor enclosure shall <br />be lined with flame resistant sound attenuating material to minimize equipment noise <br />levels to a maximum of 80 dB at ten (10) feet outside any enclosure wall. No octave <br />band shall exceed the average of its neighbors by more than 5 db. <br />E. Lights: If enclosure is intended for personnel entry, one (1) explosion proof (Class I, <br />Division I or 2, group D) ceiling light shall be provided, complete with explosion proof <br />wall mounted manual light switch, within the enclosure. <br />F. Paint: Before painting, metallic surfaces shall be cleaned and free of mill scale, <br />burrs, and sharp edges. All painted surfaces shall be prepared in accordance with <br />the paint manufacturers written instructions. Finish shall be powder coated or paint <br />as per the following: <br />1. Coat anti -corrosion, abrasion resistant industrial primer - 2 mils <br />minimum dry film thickness. <br />2. 1 coat impact resistant, weather resistant high -quality gloss enamel - <br />1.5 mils minimum fry film thickness. <br />3. Minimum total dry film thickness 3.5. <br />City of Santa Ana - RFP 20-095 <br />CNG Fuel Station: Design, Build, Operate and Maintain <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.