My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Natural Gas Fueling Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 22 - Natural Gas Fueling Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:47:29 AM
Creation date
8/17/2023 4:03:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approve Agreements with TruStar Energy LLC <br />August 17, 2021 <br />Page 3 <br />design, build, operate, and maintain a new CNG fueling station, and provide RNG at the <br />City Corporate Yard (Exhibits 1-3). <br />DESIGN AND BUILD COST ANALYSIS <br />The project will be designed and constructed in two phases. At this time, the City has <br />funding to complete Phase I and Phase II(a) — Equipment Procurement (only) allowing <br />TruStar to design the project and procure the necessary equipment. Phase II(b) - <br />Construction will proceed when funding is identified and includes construction of the <br />station and installation of the equipment. <br />To deliver the complete Design and Build Project, the estimated total project delivery cost <br />includes design/build services, construction administration, inspection, and an allowance <br />for contingencies to account for unexpected or unforeseen work. Construction <br />administration and inspection includes construction management, implementation of the <br />City's Community Workforce Agreement requirements, and inspection of the Contractor's <br />work to ensure contract compliance, workmanship, and quality. As indicated in the Cost <br />Analysis (Exhibit 4) and summarized in the table below, the estimated total construction <br />delivery cost of the project is $2,378,379. <br />Project Item <br />Total <br />Phase I: Design <br />$ <br />104,340 <br />Phase II(a): Equipment Procurement <br />$ <br />812,102 <br />Phase II(b): Construction and Installation <br />$ <br />1,412,152 <br />Phase II(a+b): Equipment and Construction <br />Contingency) <br />(15% <br />$ <br />333,638 <br />Contract Administration (6%) <br />$ <br />139,717 <br />Contingencies Inspection (5%) <br />$ <br />116,430 <br />CONSTRUCTION DELIVERY COST <br />$ <br />2,918,378 <br />Renewable Natural Gas (RNG) Credit <br />$ <br />540 000 <br />NET CONSTRUCTION DELIVERY COST <br />$ <br />2,378,379 <br />ENVIRONMENTAL IMPACT <br />The use of CNG vehicles and RNG in place of gasoline or diesel has an immediate <br />positive impact on air quality by reducing greenhouse gas emissions. The use of CNG <br />reduces noise and odor pollution, and also eliminates the risk of ground water <br />contamination. <br />FISCAL IMPACT <br />Funding for the agreements is as follows: <br />• Appropriation Adjustment from FY 2020-21 to FY 2021-22: Design and Equipment <br />Procurement Agreement: Phase I and II(a) (Equipment Procurement and <br />
The URL can be used to link to this page
Your browser does not support the video tag.