My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Natural Gas Fueling Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 22 - Natural Gas Fueling Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:47:29 AM
Creation date
8/17/2023 4:03:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Time -fill System Inlet Filters <br />Two inline coalescing filters shall be connected above ground to the pipe or stainless <br />steel tube at the inlet to the time -fill system. The two coalescing filters shall capture <br />aerosol and solid particles greater than 0.6 microns and 0.2 microns, respectively. Each <br />filter shall have a design pressure not less than 5000 psig. Filter element replacement <br />shall be performed without removing the connection piping or tubing. Filters shall be <br />Parker Finite J2 or approved equal with a block and bleed drain system installed on <br />each filter housing. Filter housings shall be installed with double ferrule fittings. <br />City of Santa Ana - RFP 20-095 <br />CNG Fuel Station: Design, Build, Operate and Maintain <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.