My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Natural Gas Fueling Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 22 - Natural Gas Fueling Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:47:29 AM
Creation date
8/17/2023 4:03:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. It has been demonstrated to the satisfaction of the City's <br />Representative that the fueling station, meets and conforms to the <br />requirements of the specification and drawings. <br />B. All testing required by this specification have been successfully <br />completed and have been accepted by the City's Representative. <br />C. Acceptance by the City's Representative of the respective <br />witnessedtests shall not release Supplier from any of its warranty <br />obligations, or any other obligation, under this Specification, the <br />Contract, the law, orin equity. <br />1.4 Supplier shall provide an informal training class in station operation, <br />service, and maintenance while on -site. The Supplier shall instruct the City's <br />designated operating and maintenance personnel in the correct and safe <br />operation, adjustment, and maintenance of all equipment and systems. <br />The basis of instruction shall be the station operating and maintenance <br />manual. <br />1.5 EQUIPMENT RECORD DRAWINGS <br />The Supplier shall update the approved shop drawings to reflect any field <br />modifications after delivery from the factory. The "as -built" shop drawings <br />shall be incorporated into the station operating and maintenance manuals. <br />1.6 OPERATING AND MAINTENANCE MANUALS <br />All product data and related information appropriate for City's <br />maintenance and operation of all products and systems provided under <br />this Contract shall be compiled into an integrated operating and <br />maintenance manual. A minimum of two copies shall be provided to the <br />City prior to acceptance. <br />---End of SCOPE OF WORK FOR DESIGN AND BUILD <br />Section.— <br />
The URL can be used to link to this page
Your browser does not support the video tag.