Laserfiche WebLink
A <br />TruStar <br />Energy CNG <br />Dear City of Santa Ana, <br />TruStar Energy is pleased to offer the following proposal for a time -fill station at the following location: <br />215 S. Center St, <br />Santa Ana, CA 92703 <br />This 100% turnkey proposal addresses the following requirements: <br />• Design, Planning, Permitting, Equipment, Construction, Start Up and Training <br />This proposal includes 2 compressor(s) and 40 time -fill hoses <br />Use the table below to determine the production capability of this proposal <br />COMPRESSOR PERFORMANCE CAPACITY [1 DGE = 1.39 cubic feet / 1 GGE = 1.267 cubic feet] <br />Compressor <br />Per Min. <br />Per Min. <br />Per Hr. <br />Per Hr. <br />Per 7 Hr. <br />Per 7 Hr. <br />Per 10 Hr. <br />Per 10 Hr. <br />Production <br />Production <br />Production <br />Production <br />Production <br />Production <br />Production <br />Production <br />GGE <br />DGE <br />GGE <br />DGE <br />GGE <br />DGE <br />GGE <br />DGE <br />1 <br />1.66 <br />1.5 <br />99.52 <br />90.22 <br />696.67 <br />631.51 <br />995.24 <br />902.16 <br />2 <br />3.32 <br />3.01 <br />199.04 <br />180.44 <br />1393.33 <br />1263.02 <br />1990.48 <br />1804.32 <br />The Time -Fill Station as quoted has the following dispensing capabilities. <br />Equipment: <br />• Time fill 1 vehicle with 25 DGE in: 0.14 hours <br />• Time fill 10 vehicles with 25 DGE in: 1.39 hours <br />• Time fill 30 vehicles with 25 DGE in: 4.16 hours <br />• Time fill 50 vehicles with 25 DGE in: 6.93 hours <br />Time fill 75 vehicles with 25 DGE in: 10.39 hours <br />The compression scenario is based off of an inlet pressure of 30 PSIG with adequate flow. Lower pressures <br />will affect the production by lowering the per minute/hour production. <br />Steve Breeze <br />TruStar Energy Sales Representative <br />TruStar Energy— 10225 Philadelphia Court, Rancho Cucamonga, 91730 • 909-793-3700 • (fax) 909-793-8056 • www.trustarenergy.com <br />