TruS <br />tar <br />Energy CNG <br />TIME -FILL STATION EQUIPMENT OVERVIEW <br />DESIGN AND ENGINEERING (to be performed by TruStar Energy) <br />TruStar Energy will initially meet to understand the requirements of your proposed station. At TruStar <br />Energy's discretion TruStar Energy will provide exhibit drawings. The design will be based off the <br />conceptual layout for the location. Upon signed agreement and 20% down payment, a final design <br />will include PE -stamped CAD drawings for each phase of the project, including but not limited to: <br />electrical, mechanical and civil for permitting purposes. TruStar Energy will acquire all permits <br />necessary for complete build in all phases of construction. <br />Design and construction will consider industry standards and all executable local, State, and/or Federal <br />building codes as interpreted by the Fire Marshall and/or building inspector with regional jurisdiction. <br />PROJECT MANAGEMENT <br />A dedicated project manager is assigned to each project for the duration of the project. The assigned <br />project manager is involved with the project from the design phase throughout the construction and <br />startup. The project manager will be 100% responsible for all of the daily activity at the job site and will <br />report construction progress to the customer's designated contact on a weekly basis. This project <br />manager is responsible to ensure that all TruStar Energy employees and subcontractors follow TruStar <br />Energy and Customer safety and site policies. The project management fee includes site equipment <br />mobilization, TruStar Energy employee travel & lodging and project management. <br />START UP LABOR <br />Includes certified equipment technician on site for four days, on site operations and maintenance <br />training and one site follow-up visit by technician in first six months after start up. <br />UTILITY EXTENSIONS REQUIRED BY CUSTOMER <br />• A single High Speed Broadband Internet (RJ45) connection for CP-400 Communication <br />(3MB minimum - 7MB optimal) package is required at the compressor staging area. <br />• A second phone line is required for customers using a gas broker for a telemetric meter. <br />• A third High Speed Broadband Internet (RJ45) connection (3MB minimum - 7MB optimal) is <br />required for customers using a credit card reader for public fuel dispensing or private fleet <br />information collection. <br />Electrical Service - <br />• A 400 amp electrical service is required at the compressor staging area from your Electric Utility <br />provider - 277/480, 3 phase 4-wire service. <br />Natural Gas Service - <br />• 30 psi pressure capable of delivering 25080 cubic feet of natural gas per hour, with the gas <br />meter located at the compressor staging area. Note: (lower pressures can be acceptable for <br />the production of CNG at the designated site location. Lower pressures will drop the hourly <br />production rate of CNG. <br />The customer is responsible to provide all electrical, phone and gas service as required within 25 feet of <br />the compressor compound and responsible for all associated costs. TruStar Energy will work with your <br />local utilities to validate existing service and determine what necessary upgrades are required to satisfy <br />utilities requirements. Assumptions: TruStar Energy takes no responsibility for the unforeseen. TruStar <br />Energy assumes that the soil is not contaminated and is suitable for backfill. <br />Tru3ar Energy - 10225 Phladelph is Court, Rancho Cucamonga, 91730. 909-793-3700 • (fax) 909-793.J0 56 • www.trushrenergy.com <br />