My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Natural Gas Fueling Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 22 - Natural Gas Fueling Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:47:29 AM
Creation date
8/17/2023 4:03:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SERVICE AGGREEMENT —All INCLUSIVE 100% WARRANTY <br />• TruStar Energy personnel shall prepare and provide client with a (PM) Service report at the <br />conclusion of each (PM) or repair event. This report shall detail (PM) activities, actions taken, <br />and list potential future hard parts replacement events. <br />• TruStar Energy shall perform such (PM) services during normal business days and hours of <br />operation. <br />• TruStar Energy personnel will not remove hazardous waste materials (used Oil) from <br />Customer's job site. Customer shall provide TruStar Energy with approved containers for the <br />disposal of subject hazardous waste materials. <br />• TruStar Energy provide 100% parts, service and warranty on the station during the term. If there <br />is damage created to the station that is not part of ongoing wear and tear of CNG operations, <br />TruStar will invoice for any damaged parts and labor caused by customer negligence such as <br />trucks driving away with connected hoses and equipment hit and damaged by trucks. Prior to <br />invoicing, TruStar will discuss damage with the customer site manager and get sign off for <br />repairs. Customer will reserve the rights to replace or repair customer damaged items at their <br />own expense. <br />• All Major compressor rebuilds will be done by Ariel or Sauer factory trained and certified <br />compressor Master Technicians. <br />Below are the tasks required to maintain the CNG station that TruStar will be providing along <br />with weekly inspection reports filled out by the site technicians and made available to the <br />customer. <br />Energy <br />10225 Philadelphia Court One North Lexington Avenue 1928 32nd Ave NW <br />Rancho Cucamonga, CA 91730 White Plains, New York 10601 Rochester, MN 55901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.