My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - Design Services for the Standard — McFadden Park Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 30 - Design Services for the Standard — McFadden Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:56:39 AM
Creation date
8/17/2023 4:11:59 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
30
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to provide <br />Landscape Architectural Design for Standard -McFadden Park — RFP No. 21-055 <br />■ Statis and seismic lateral earth pressure for <br />retaining walls (pedestrian bridges) <br />■ Light pole foundation design and construction <br />recommendations. <br />■ Geotechnical parameters for skate bowl design <br />■ Parking Lot pavement design recommendations <br />■ Parking lot subgrade preparation <br />recommendations <br />■ Sidewalk and flatwork recommendations. <br />Deliverables: Geotechnical report. <br />Task 5 - Preliminary Hydrology and Hydraulics <br />Analysis <br />DEA will prepare a preliminary drainage study for <br />the project site. A rational method analysis of the <br />site will be performed addressing the pre and post <br />construction 10- and 50-year storm events. The <br />rational analysis will determine the pre -and post - <br />construction surface flow and serve as the basis <br />for sizing of on -site drainage facilities to retain the <br />difference in the pre- and post -construction conditions. <br />This analysis, along with the percolation test data <br />provided by the project geotechnical engineer will be <br />used to size the project infiltration system. <br />Deliverables: Hydrology and hydraulic analysis <br />report. <br />Task 6 - Public Outreach and Project Meetings <br />DEA will be available for two public outreach <br />meetings to present the project to the community. <br />We understand that these may be virtual or in -person <br />and hence will be prepared for either format once this <br />is determined. DEA will organize, promote (create <br />mailing list based on City input) and facilitate these <br />meetings in addition to providing the presentation <br />material (graphics and renderings). The goal of these <br />meetings includes discussing key project aspects, <br />benefits and consequences, and to gain input from <br />local residents on the design and aesthetics. DEA will <br />have a bilingual design team member available for <br />each team meeting. <br />Additionally, the DEA team will attend progress <br />meetings once to twice a month with staff throughout <br />the duration of the project in addition to the start-up <br />meeting. Fees are based on an average meeting time <br />of 1 hour. If additional meetings are required beyond <br />the allocated hours, DEA will provide a scope and fee <br />to supplement this task if needed. Where appropriate, <br />virtual meetings will be hosted by DEA. Given the <br />proximity of our office to the City, we anticipate being <br />ON <br />6 <br />I <br />j <br />Decorative Fencing at Ovrom Park Basketball Court <br />available for in -person meetings as needed. <br />Deliverables: Attendance at two public outreach <br />meetings including assistance with promoting <br />said meetings, in addition to attendance at <br />project meetings during the design development / <br />construction document phase of work as noted and as <br />allocated in the fee schedule. <br />Task 7 — Design Development Plans (60%) <br />Based on the approved conceptual plan, DEA <br />will prepare a 60% design development package <br />including landscape architectural, civil and electrical <br />engineering plans, in addition to draft technical <br />specifications and a preliminary cost estimate. <br />Milestone submittals shall include plans, specs, <br />preliminary quantities, pay items, design calculations <br />and reports (geotechnical, hydrology). <br />Deliverables: Preparation of a design development <br />level PS&E package as described above. <br />Task 8 — Final Construction Document Phase <br />(90% and 100% plans) <br />Constructability review meetings will occur at 90% <br />and shall include the City and DEA. The design team <br />will perform the quality assurance/ quality control (QA1 <br />QC) efforts and provide those to the City prior to the <br />constructability review. <br />During the construction document phase, DEA will <br />include two full sets of the construction documents for <br />review at 90%, in addition to one electronic PDF copy <br />in MicroStation CONNECT. <br />At 100% completion, DEA will provide one full sized <br />set of signed and sealed bond copies in addition <br />to one electronic PDF copy (signed final design <br />plans, specifications in Word, QA/QC checklist, cost <br />estimate and design calculations). <br />David Evans and Associates, Inc. I June 3, 2021 1 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.