My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Sewer System Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
Item 13 - Sewer System Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 12:05:56 PM
Creation date
8/17/2023 5:13:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
7/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. A. Rasic Construction <br />4150 Long Beach Blvd. <br />Long Beach, CA 90807 <br />SCOPE OF SERVICES <br />CLIENT: The City of Santa Ana <br />PROJECT: Sewer System Repair Services - RFP No. 21-036 <br />WAR PROJECT NUMBER: S430A <br />Date: 19-Jan-21 <br />1 Repair/Replace 6 or 8" Sewer Main (min. 6' section up to 8' deep) 500 Linear Feet <br />1.1 Daily Traffic Control (inc. road plates) <br />1.2 Sawcut AC <br />1.3 Excavation to Expose Line Break (6'-8' Deep) <br />1.4 Plug Broken Line at the Upstream Manhole <br />1.5 Suction Truck for Sewage Removal at Manhole & Excavation Site <br />1.6 Repair Line Break (inc. pipe & fitting purchase) <br />1.7 Unplug Broken Line at the Upstream Manhole <br />1.8 1/2" Rock Bedding & SE30 Full Backfill (Std. Plan 1150) <br />1.9 AC Restoration <br />1.10 Spoil Disposal <br />2 Repair/Replace 6 or 8" Sewer Main (6' section at 8'-12' deep) 250 Linear Feet <br />2.1 Daily Traffic Control (inc. road plates) <br />2.2 Sawcut AC <br />2.3 Excavation to Expose Line Break (8'-12' Deep) <br />2.4 Plug Broken Line at the Upstream Manhole <br />2.5 Suction Truck for Sewage Removal at Manhole & Excavation Site <br />2.6 Repair Line Break (inc. pipe & fitting purchase) <br />2.7 Unplug Broken Line at the Upstream Manhole <br />2.8 1/2" Rock Bedding & SE30 Full Backfill (Std. Plan 1150) <br />2.9 AC Restoration <br />2.10 Spoil Disposal <br />3 Repair/Replace 10 or 12" Sewer Main (6' section not more than 8' deep) 100 Linear Feet <br />3.1 Daily Traffic Control (inc. road plates) <br />3.2 Sawcut AC <br />3.3 Excavation to Expose Line Break (6'-8' Deep) <br />3.4 Plug Broken Line at the Upstream Manhole <br />3.5 Suction Truck for Sewage Removal at Manhole & Excavation Site <br />3.6 Repair Line Break (inc. pipe & fitting purchase) <br />3.7 Unplug Broken Line at the Upstream Manhole <br />3.8 1/2" Rock Bedding & SE30 Full Backfill (Std. Plan 1150) <br />3.9 AC Restoration <br />3.10 Spoil Disposal <br />4 Repair/Replace 10 or 12" Sewer Main (6' section at 8'-12' deep) 100 Linear Feet <br />4.1 Daily Traffic Control (inc. road plates) <br />4.2 Sawcut AC <br />4.3 Excavation to Expose Line Break (8'-12' Deep) <br />4.4 Plug Broken Line at the Upstream Manhole <br />4.5 Suction Truck for Sewage Removal at Manhole & Excavation Site <br />4.6 Repair Line Break (inc. pipe & fitting purchase) <br />4.7 Unplug Broken Line at the Upstream Manhole <br />4.8 1/2" Rock Bedding & SE30 Full Backfill (Std. Plan 1150) <br />4.9 AC Restoration <br />4.10 Spoil Disposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.