Laserfiche WebLink
5 <br />Remodel Manhole Base <br />5.1 <br />Remodel Manhole Base <br />6 <br />Construct New Manhole (8' max depth) <br />6.1 <br />Purchase New Frame & Cover <br />6.2 <br />Purchase Precast Shafting <br />6.3 <br />Daily Traffic Control (inc. road plates) <br />6.4 <br />Sawcut AC <br />6.5 <br />Excavation & 12" Rock Base (8' Deep) <br />6.6 <br />Construct CIP Manhole Base <br />6.7 <br />Install Precast Shafting & Set Frame & Cover <br />6.8 <br />SE30 Full Backfill (Std. Plan 1150) <br />6.9 <br />AC Restoration <br />6.10 <br />Spoil Disposal <br />7 <br />Construct New Manhole (8'-12' depth) <br />7.1 <br />Purchase New Frame & Cover <br />7.2 <br />Purchase Precast Shafting <br />7.3 <br />Daily Traffic Control (inc. road plates) <br />7.4 <br />Sawcut AC <br />7.5 <br />Excavation & 12" Rock Base (8'-12' Deep) <br />7.6 <br />Construct CIP Manhole Base <br />7.7 <br />Install Precast Shafting & Set Frame & Cover <br />7.8 <br />SE30 Full Backfill (Std. Plan 1150) <br />7.9 <br />AC Restoration <br />7.10 Spoil Disposal <br />8 Raise Existing Manhole F&C & Replace Collar <br />8.1 Purchase New Frame & Cover <br />8.2 Install Precast Shafting & Set Frame & Cover <br />8.3 AC Restoration <br />9 Replace Manhole Cover Concrete Collar <br />9.1 Replace Manhole Cover Concrete Collar <br />10 Furnish & Install Traffic Loop <br />10.1 Install New Loop <br />11 Provide Sewer Lateral Lining with Cleanout (4 or 6") <br />11.1 Sawcut & Remove Existing PCC Sidewalk <br />11.1.1 Sawcut PCC Sidewalk <br />11.1.2 Removal & Disposal <br />11.2 Excavate & Remove Section of Lateral <br />11.3 Shoot New Liner Material (Per Foot - 30' min section) <br />11.4 Replace Section of Sewer Lateral & Provide New Cleanout <br />11.5 Backfill, Compact & Install New PCC Sidewalk <br />11.5.1 Backfill & Compaction <br />11.5.2 New PCC Sidewalk <br />12 Provide Top Hat Repairs (4 or 6" Sewer Lateral Pipe) <br />12.1 Purchase NewTop Hat <br />12.2 Install Top Hat & Concrete Collar <br />13 Provide Pipe Bursting Repair with Cleanout (4 or 6" Sewer Lateral Pipe) <br />13.1 Sawcut & Remove Existing PCC Sidewalk <br />13.1.1 Sawcut PCC Sidewalk <br />13.1.2 Removal & Disposal <br />13.2 Excavate & Remove Section of Lateral <br />13.3 Bursting Repair with Cleanout (4 or 6" Sewer Lateral Pipe) <br />13.4 Replace Section of Sewer Lateral & Provide New Cleanout <br />13.5 Backfill, Compact & Install New PCC Sidewalk <br />13.5.1 Backfill & Compaction <br />13.5.2 New PCC Sidewalk <br />10 Each <br />50 Each <br />10 Each <br />30 <br />Each <br />30 <br />Each <br />5 <br />Each <br />60 Each <br />40 Each <br />25 Each <br />