My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Sewer System Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
Item 13 - Sewer System Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 12:05:56 PM
Creation date
8/17/2023 5:13:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
7/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Public Works Agency <br />RFP No.: 21-036 — Sewer System Repair Services -r:; <br />Project #4: <br />Project Name: City of Temecula Old Town Sewer Improvements <br />Location: Temecula, CA <br />Owner: Eastern Municipal Water District <br />Owner Contact (name and current phone number): <br />Karl Roland, Construction Manager (951) 928-3777 <br />Architect or Enaineer: <br />HDR, Inc. <br />Architect or Engineer Contact (name and current phone number): <br />Steve Freidman (951) 928-3777 <br />Construction Manager Contact (name and current phone num <br />Karl Roland, Construction Manager (951) 928-3777 <br />Description of Project, Scope of Work Performed: <br />Installation of approximately 3,100 LF of 15-inch gravity relief sewer along Front Street <br />from Moreno Road to First Street. Connected the new gravity relief sewer to the <br />existing sewer and constructed (4) interconnections. The new relief sewer was to be <br />installed using guided boring method with shafts located at street intersections along the <br />Front Street. The specified guided bore method was unsuccessful and the project was <br />redesigned and installed using five conventional bores and open cut excavation of one <br />section. Responsible for relocating existing utilities; implementing traffic and pedestrian <br />control measures; installation and monitoring of ground, utility, and surface movement <br />monitoring sensors; installation of manholes; collection and disposal of groundwater <br />encountered during construction; restoration of AC pavement; restoration of sidewalks, <br />boardwalk, curb and gutter, curb return, and handicap access ramps. <br />Total Value of Construction (including change orders): $ 12,048,760 <br />Original Scheduled Completion Date: November 2015 <br />Time Extensions Granted (number of days): 168 days <br />Actual Date of Completion: March 2016 <br />W. A. R AS1C C�RSTHIICTIdH <br />
The URL can be used to link to this page
Your browser does not support the video tag.