My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Sewer System Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
Item 13 - Sewer System Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 12:05:56 PM
Creation date
8/17/2023 5:13:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
7/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Public Works Agency <br />RFP No.: 21-036 — Sewer System Repair Services -r:; <br />Project #5: <br />Project Name: Metro Gold Line Foothill Extension Construction Authority- Utility <br />Relocation Project <br />Location: Glendora/ San Dimas/ La Verne, CA <br />Owner: Metro Gold Line Foothill Extension Construction Authority <br />Owner Contact (name and current phone number): <br />Mitchell S. Purcell, Esq., Chief Contracting Officer (626) 305-7035 <br />Architect or Engineer: <br />Ch2m <br />Architect or Engineer Contact (name and current phone number): <br />Matthew Reifer, Civil Engineer (714) 429-2000 <br />Construction Manager Contact (name and current phone number): <br />Reky Hiramoto, Deputy Chief Project Officer (626) 471-9050 <br />Description of Project, Scope of Work Performed: <br />Protect in place existing water and sewer lines by utilizing a split steel casing and <br />pouring concrete encasements. Work within SCRRA rail corridor with deep shored <br />excavations or within road ROW. Installation of a new LACSD manhole at 20+ feet deep <br />along Arrow Hwy was another scope of work. Permitting and inspection were the most <br />challenging aspects of the project. Permits were required by SCRRA, City of Glendora, <br />City of San Dimas, and City of La Verne. Inspections were done by the permit <br />authorities and in addition Gold Line Authority, LACSD and GSWC also had fulltime <br />inspection. <br />Total Value of Construction (including change orders): $ 2,328,141 <br />Original Scheduled Completion Date: November 2018 <br />Time Extensions Granted (number of days): 0 <br />Actual Date of Completion: September 2018 (Ahead of Schedule) <br />W. A. R AS1C C�RSTHIICTIdH <br />
The URL can be used to link to this page
Your browser does not support the video tag.