Laserfiche WebLink
2 Perform the work daily. <br />3.Provide the necessary labor, materials and equipment to remove weeds from all <br />sidewalk areas, planters and public lots. <br />4.Remove all litter (trash, paper, cans, bottles, signs and otherdebrls). <br />5.Remove all unwanted natural or environmental materials, including, but not limited <br />to bio-waste, hypodermic needles, dirt, silt, feces, soot, weeds. <br />6.Clean, cut, clear, and remove weeds and remove of light to medium amounts oftrash by using hand-held equipment like weed eaters, rakes, brooms, and leaf <br />blowers. Leave no piles, or residue with rake marks. Sidewalk surface shall be <br />clean of leaves, litter, and dirt. <br />7.Crew must be self-directed and report directly to the main office of Contractor. <br />8.Crew must be 'on-call" and carry a dedicated cell phone and be available duringnormal business hours on all workdays. <br />9.Additional duties that may be required of the Right of Way Cew may include thefollowing: clear catch basins during winter rain and storms, fill sandbags, removeextra trash and debris generated by special events, remove litter and vegetation at <br />City-owned parcels, remove homeless camp debris, and assist street sweepers indebris removal during weather events, ex. wind or rain. <br />10.Note the trash likely to be encountered during the course of Right of Way Cleaning <br />includes but is not limited to litter, trash, bio-waste and hypodermic needles, plastic, <br />and cardboard containers, plywood, used lumber, discarded furniture, and small <br />appliances, toys and other household items. <br />11.Remove and dispose of items listed above according to all applicable laws, codes, <br />and requirements. <br />12 Note that trash removal Is incidental to weed removal by either crew. It is included <br />so that the areas look clean after the weed removal work is completed. <br />13.The Contractor shall collect all clippings, trimmings, cuttings, rubbish and debris, andposted signs at all work sites and dispose of same in a lawful manner per contractrequirements at the Contractor's expense. <br />14.All trash and debris shall be removed from all worksites a minimum of one (1) time perweek. <br />15.The Contractor shall rake, hand remove, or vacuum leaves that are not absorbed byplanting. This shall be done as often as required to maintain a neat appearance, or prevent plants from being smothered by seasonal leaf drop at least weekly or as directed by Projects Manager or deslgnee.