2 Perform the work daily.
<br />3.Provide the necessary labor, materials and equipment to remove weeds from all
<br />sidewalk areas, planters and public lots.
<br />4.Remove all litter (trash, paper, cans, bottles, signs and otherdebrls).
<br />5.Remove all unwanted natural or environmental materials, including, but not limited
<br />to bio-waste, hypodermic needles, dirt, silt, feces, soot, weeds.
<br />6.Clean, cut, clear, and remove weeds and remove of light to medium amounts oftrash by using hand-held equipment like weed eaters, rakes, brooms, and leaf
<br />blowers. Leave no piles, or residue with rake marks. Sidewalk surface shall be
<br />clean of leaves, litter, and dirt.
<br />7.Crew must be self-directed and report directly to the main office of Contractor.
<br />8.Crew must be 'on-call" and carry a dedicated cell phone and be available duringnormal business hours on all workdays.
<br />9.Additional duties that may be required of the Right of Way Cew may include thefollowing: clear catch basins during winter rain and storms, fill sandbags, removeextra trash and debris generated by special events, remove litter and vegetation at
<br />City-owned parcels, remove homeless camp debris, and assist street sweepers indebris removal during weather events, ex. wind or rain.
<br />10.Note the trash likely to be encountered during the course of Right of Way Cleaning
<br />includes but is not limited to litter, trash, bio-waste and hypodermic needles, plastic,
<br />and cardboard containers, plywood, used lumber, discarded furniture, and small
<br />appliances, toys and other household items.
<br />11.Remove and dispose of items listed above according to all applicable laws, codes,
<br />and requirements.
<br />12 Note that trash removal Is incidental to weed removal by either crew. It is included
<br />so that the areas look clean after the weed removal work is completed.
<br />13.The Contractor shall collect all clippings, trimmings, cuttings, rubbish and debris, andposted signs at all work sites and dispose of same in a lawful manner per contractrequirements at the Contractor's expense.
<br />14.All trash and debris shall be removed from all worksites a minimum of one (1) time perweek.
<br />15.The Contractor shall rake, hand remove, or vacuum leaves that are not absorbed byplanting. This shall be done as often as required to maintain a neat appearance, or prevent plants from being smothered by seasonal leaf drop at least weekly or as directed by Projects Manager or deslgnee.
|