Laserfiche WebLink
25.Afl valve boxes, controllers, and backflow devices shall be keptclear of plant growth. <br />26.Contractor shall be responslbleforperlodic Inspection of surfacedrains located within the landscaped areas. These drains shall <br />be checked to assure proper functioning. Remove any debris or <br />vegetation that might accumulate at the Inlet and prevent proper <br />flow of water. <br />27.Any erosion damage because of Contractor's failure to keep the <br />surface dralnscfear shall be repaired at Contractor's expense.