My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - El Salvador Park & Riverview Park Sports Lighting Renovation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
Item 11 - El Salvador Park & Riverview Park Sports Lighting Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:22:53 PM
Creation date
8/21/2023 3:30:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11
Date
7/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Construction Contract to RMF for Projects 20-2714 and 20-2717 <br />July 6, 2021 <br />Page 2 <br />projects will improve safety in the area and enhance the community's ability to play <br />basketball and participate in sports activities. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, the City notified a total of <br />1,034 regional vendors via PlanetBids, many of which are Santa Ana based. Sixty-five <br />vendors requested bidding documents, and a total of four bids were received. Bids were <br />not received from any Santa Ana contractors. <br />As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br />newspaper on April 15 and 22 of 2021. The projects were also advertised in PlanetBids <br />from April 12, 2021 through May 12, 2021. Bids were received electronically via <br />PlanetBids on May 12, 2021. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />RMF Contracting, Inc. dba R&M <br />Electrical Contracting <br />Lake Forest <br />$ 748,014 <br />2 <br />HYM Engineering, Inc. <br />Fullerton <br />$ 876,500 <br />3 <br />Solex Construction, Inc. <br />Los Angeles <br />$ 912,565 <br />4 <br />Bedrock Group, Inc. <br />La Canada <br />$1,031,400 <br />Of the four bids received, and all were deemed responsive. RMF Contracting, Inc. dba <br />R&M Electrical Contracting submitted the lowest responsive base bid in the amount of <br />$748,014 (Exhibit 3). As specified in the bid documents, the lowest bid shall be <br />determined on the basis of the Base Bid. Based on the bid analysis and a contractor's <br />reference check, staff recommends awarding the construction contract to RMF <br />Contracting, Inc. dba R&M Electrical Contracting, in the amount not to exceed $748,014 <br />(Exhibit 4). <br />Project Delivery <br />To deliver complete projects, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen conditions. <br />Construction administration and inspection includes construction management; <br />implementation of the City's Community Workforce Agreement requirements; inspection <br />of the Contractor's work to ensure contract compliance, workmanship, and quality; and <br />materials testing. As indicated in the Cost Analysis (Exhibit 5) and as summarized in the <br />table below, the estimated total construction delivery cost of the project is $935,018. <br />
The URL can be used to link to this page
Your browser does not support the video tag.