Laserfiche WebLink
AESCO <br />AESCO Proposal No. P6513 <br />Statement of Qualifications <br />Adam Chamaa <br />Engineering Manager, M.S.C.E.,P.E.,G.E.----------------� <br />Registered civil and geotechnical engineer with over 25 years of Education: ' <br />experience as geotechnical engineer and quality control/quality M.S. Civil ' <br />assurance (QC/QA) manager. Responsible for QC/QA engineering for i Engineering, <br />new construction, foundations, sewer installations, roadway surfaces Geotechnical and <br />during and after installation, design of de -watering systems, pump Highway Design; <br />Louisiana Technical <br />stations, and assessment of soil -related environmental contamination. University, Ruston, LA, <br />Provided geotechnical design recommendations for new construction ; 1985. <br />for municipal, governmental and commercial projects throughout <br />California. <br />B.S., Civil <br />Engineering, <br />' Louisiana Technical <br />Specific Project Experience University, Ruston, <br />Louisiana, 1982 <br />Widening of the 91 Freeway -Orange and Riverside Counties <br />Registrations: i <br />Engineering Manager: Mr. Chamaa was the Engineering Manager for materials ' <br />1 California No. C53992 <br />testing and inspection during the widening of the 91 Freeway for Caltrans. (Civil) ' <br />The widening project included the construction of new lanes on the east and California No. C2784 <br />westbound sides, new retaining walls, bridges, slope stability of cuts, rock i (Geotechnical) <br />exploration, etc. The testing and inspection services included a review of the Nevada No. 022245 <br />concrete mix designs, concrete testing and inspection, concrete batch plant i (Civil) <br />inspection, pile inspection and logging, rebar inspection, aggregate testing, L _ _ _ _ _ _ _ _ _ _ _ _ <br />welding inspection, subgrade testing and inspection, base material evaluation and testing, <br />compaction testing and inspection, and asphaltic concrete testing. <br />Perris Valley Line Commuter Rail Extension Project- Riverside County <br />Engineering Manager: Mr. Chamaa was the Engineering Manager for quality control inspection and <br />materials testing and geotechnical engineering services for the Riverside County Transportation <br />Commission. The project involves a 24-mile extension of the existing 512-mile Metrolink commuter <br />rail system from Riverside to Perris. <br />14-Inch Water Line Installation under Huntington Harbor Channel -City of Huntington Beach <br />Engineering Manager: Mr. Chamaa was the Engineering Manager for a geotechnical investigation <br />for a new 14-inch diameter water line composed of High Density Polyethylene (HDPE) pipe for the <br />City of Huntington Beach. The length of the new pipe ranged from 750 feet to 950 feet. The pipe <br />was installed beneath the Huntington Harbor bottom which is at an approximate depth of 20 feet <br />below high sea level. The water line connected to existing water systems on either side of the <br />channel. <br />Alameda Corridor, Temple Avenue 4th Track Improvements -Pomona <br />Engineering Manager: Mr. Chamaa was the Engineering Manager for the preparation of the QC/QA <br />manual and supervised materials testing and inspection during construction of a new railroad grade <br />separation. The project included railroad bridges, retaining walls, depressed roadways, utility <br />relocations, roadway bridges, channel walls and drainage ditches. <br />Construction Material Testing/ Inspection <br />Environmental and Geotechnical Engineering Services 221 Page g a i t d i a q 4 m e z i c a <br />www.AescoTech.com 7 z a m % 4 e Cf z a a o d 'U A <br />