Laserfiche WebLink
ArEsco <br />AESCO Proposal No. P6513 <br />Statement of Qualifications <br />Design/Build SR-22 Freeway Widening -Garden Grove <br />Engineering Manager: Mr. Chamaa was the Engineering Manager for the inspection and mix design <br />alternatives and recommendations for the Portland Cement Concrete (PCC) and Lean Concrete Base <br />for the widening and overall improvement for Orange County Transit Authority (OCTA) and Caltrans. <br />Mr. Chamaa worked with the design team and the contractor to qualify aggregate testing and <br />evaluation of the concrete and performed on -site mix design trials. Recommended the most <br />appropriate mix design and additives based on California Test methods. Supervised the testing of <br />concrete products during placement which included aggregate testing, concrete cylinders, LCB <br />samples and flexural strength beam tests. Supervised the flexural strength of the concrete during <br />the pavement construction. <br />Calico Solar Plant Access Bridge -San Bernardino County <br />Engineering Manager: Mr. Chamaa supervised and reviewed the geotechnical recommendations for <br />foundation design for the proposed bridge structure and retaining walls for the BNSF railroad. <br />Preliminary geotechnical recommendations including pile load design data for caissons, driven piles, <br />tip -bearing piles, and friction piles, as well as lateral loads were provided. A review of existing <br />geotechnical and seismic data was conducted for projects in the vicinity. <br />Plant No. 1 Sludge Dewatering Project -Fountain Valley <br />Engineering Manager: Mr. Chamaa was the Engineering Manager for the construction materials <br />testing and inspections for the sludge dewatering project at Plant 1 for Orange County Sanitation <br />District. This project was to enhance the use of existing digesters, and replace the existing sludge <br />handling facility. The new dewatering equipment will remove more water from the biosolids than <br />existing facilities, which in turn will reduce the hauling cost to remote sites. <br />First Street Bridge Replacement -Santa Ana <br />Engineering Manager: Mr. Chamaa supervised the construction materials testing and inspections <br />during the bridge replacement. Testing and inspections were conducted on piles, welding, <br />structural steel, precast concrete, concrete, asphalt, mix designs, etc. <br />Ranger Sewer Lift Station No. 16 — City of Huntington Beach <br />Engineering Manager: Mr. Chamaa was the Engineering Manager for the geotechnical investigation <br />and the materials testing and inspection for construction of Ranger Sewer Lift Station No. 16 in the <br />City of Huntington Beach. The new lift station was 24 feet by 24 feet in plan dimension and was <br />placed at a depth of 18 feet below the existing ground surface. Recommendations were made for a <br />mat foundation, dewatering during construction, waterproofing, pipe bedding, lateral pressures, <br />and shoring. <br />Belmont Pool Rebuild -Revitalization -City of Long Beach <br />Engineering Manager: Mr. Chamaa was the Engineering Manager for the geotechnical and Phase II <br />environmental investigation for the new Belmont Pool for the City of Long Beach. The project <br />generally consists of constructing an indoor pool which is approximately 85 feet by 190 feet in plan <br />dimension housed inside an approximately 60, 000 square foot structure. An outdoor pool with a <br />plan dimension of approximately 85 feet by 185 feet will be located just east of the structure. <br />Construction Material Testing/ Inspection , <br />Environmental and Geotechnical Engineering Services 23 I I a g e g a i t d i a q 4 m e z i c a <br />www.AescoTech.com 7 z a m % 4 e Cf z a a o d ZI A <br />