My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Spill Response, Hazardous Waste Disposal, and Storm Drain Facility Maint. Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/15/2021 Regular
>
Item 26 - Spill Response, Hazardous Waste Disposal, and Storm Drain Facility Maint. Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:59:02 PM
Creation date
8/21/2023 4:12:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
26
Date
6/15/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Location <br />• Dimensions <br />• Asset identification number <br />• Trash capture device type and condition <br />• Damage (face plate, protection bar, manhole, interior, inlet/outlet pipes) <br />• Obstructions or vegetation growing <br />• Condition of "No Dumping" stencil <br />• Volume of trash, debris, and sediment removed during cleaning <br />• Inlet/outlet pipe diameter and material <br />f. Stencil "No Dumping Drains to Ocean" on the top of catch basin inlets. <br />g. Install and/or repair trash capture devices in Municipal catch basins, including but not <br />limited to: <br />• Connector Pipe Screen (CPS) units <br />• Auto -Retractable Screen (ARS) units <br />• Other devices listed on the State Water Resources Control Board Certified <br />Full Capture List of Trash Treatment Control Devices: <br />https://www.waterboards.ca.gov/water issues/programs/stormwater/docs/ <br />trash _implementation/certified _fcsdevicelist 16Feb2021.pdf <br />h. Provide on -call operations, maintenance, and repair services for the City's First Street <br />stormwater lift station, including but not limited to: <br />• Monitoring storm events and performing inspections to verify lift station is <br />operational and ready to pump stormwater <br />• Vacuum cleaning lift station wet -well, stormdrain lines, and catch basin <br />inlets as -needed <br />• Responding to and resolving urgent issues with the lift station 24-hours a <br />day, 7-days a week <br />• Conducting electrical and mechanical repairs or troubleshooting as -needed <br />The City will provide basic training on stormwater lift station operations. <br />Contractors shall respond to lift station issues within 1-hr of initial request. <br />i. Procure and install metal gates within or at the outlet of stormdrain facilities. At a <br />minimum, metal gates shall: <br />• Prohibit access by the public into stormdrain facilities <br />• Have a tamper -proof locking mechanism for dry -weather conditions <br />• Be capable of opening freely during storm conditions or debris blockage <br />City of Santa Ana RFP 21-004 Page A1-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.