My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - McFadden Avenue Protected Bike Lane and Bicycle Boulevard: Harbor to Grand
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/01/2021 Regular
>
Item 16 - McFadden Avenue Protected Bike Lane and Bicycle Boulevard: Harbor to Grand
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:09:33 PM
Creation date
8/21/2023 4:20:59 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
6/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- MCFADDEN AVENUE PROTECTED BIKE LANE AND ~m'� <br />BICYCLE BOULEVARD PROJECT <br />CITY OF SANTA ANA <br />STAFF AVAILABILITY <br />In order to meet the City's needs for this project, we have organized a team that has a proven track <br />record and availability to deliver the project. The team is put together to give the City the maximum <br />flexibility possible in order to meet all of the contract's needs. The following chart provides the <br />availability of the key staff. <br />Michael Greer, PE, TE <br />Project Manager <br />Joe Ostdiek, PE, TE <br />Traffic Engineering <br />Justin Thornber, PE <br />Roadway/Bikeway <br />Design <br />Pamela Dalcin-Walling, <br />PE, QSD/P <br />Drainage <br />Jena Addenbrooke, PE <br />Utility Coordination <br />Jamie Formico, SR/INA <br />Railroad Coordination <br />Fong -Ping Lee, PE, TE <br />Traffic Engineering <br />Current Commitments <br />Time <br />AvailabilityCommitment <br />■ San Pablo Phase II <br />10% <br />■ Caltrans District 6 On -Call <br />20% <br />60% <br />■ County of San Diego On -Call <br />10% <br />■ Superior Avenue OC & Parking Lot <br />30% <br />■ Iris Rapid Corridor and Station <br />20% <br />40% <br />■ SR 99 Phase 5 Bikeway <br />10% <br />■ San Pablo Avenue, Phase 1 <br />10% <br />70% <br />■ Caltrans District 3 On -Call <br />20% <br />■ Del Rio Trail <br />25% <br />■ Monge Ranch Road Bridge <br />15% <br />45% <br />■ Capital SouthEast Connector <br />15% <br />■ Mid Coast Corridor Transit Project <br />20% <br />60% <br />■ UCSD Utility Projects <br />20% <br />■ E Palm Canyon Dr Bridge Widening <br />20% <br />■ 1-80 Auxiliary Lanes PS&E <br />20% <br />45% <br />■ Riverwalk Trail Extension <br />15% <br />■ METRO Los Angeles River Bike Path <br />20% <br />Gap Closure <br />60% <br />■ LAWA 981h Street Improvements <br />20% <br />UNDERSTANDING OF NEED <br />MANAGEMENT APPROACH <br />Dokken Engineering enlists a management approach that is to be an extension of the City staff and <br />provide the City an experienced team throughout the life of our projects. Our team will provide the <br />resources and tools necessary to deliver this project with minimal oversight from the City staff. <br />Maintaining Constant Open Lines Communication <br />Dokken Engineering has chosen a Project Manager in Michael Greer, PE, TE who is uniquely qualified <br />to deliver this project for the City due to his recent experience on projects that include signal <br />modifications, bike lane additions, and road -diets to add traffic calming countermeasures. In addition <br />to regular communication via monthly project team meetings, Mike will keep the City's Project Manager <br />aware of progress through weekly emails and as -needed team conference calls. This approach allows <br />the City's Project Manager to provide any required input throughout the project development process. <br />As an extension of the City staff, Mike and his team will use a suite of communication mechanisms to <br />keep the City informed and to maintain the project schedule. Dokken Engineering has long-standing <br />history of delivering projects with multiple team members and stakeholders, and we have established <br />communication protocols that all team members understand. The following diagram identifies the key <br />communication methods to deliver this project. <br />R§DOKKEN Page 1 7 <br />ENGINEERING <br />
The URL can be used to link to this page
Your browser does not support the video tag.