My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - McFadden Avenue Protected Bike Lane and Bicycle Boulevard: Harbor to Grand
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/01/2021 Regular
>
Item 16 - McFadden Avenue Protected Bike Lane and Bicycle Boulevard: Harbor to Grand
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:09:33 PM
Creation date
8/21/2023 4:20:59 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
6/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LX <br />MCFADDEN AVENUE PROTECTED BIKE LANE AND"w. <br />. ■, - BICYCLE BOULEVARD PROJECT <br />CITY OF SANTA ANA ul__�_�_-- <br />leetings <br />solve <br />Lies <br />AgE <br />Cal <br />• Re; <br />We host weekly internal team teleconference calls to track progress and keep everyone current on <br />project status and recent decisions that affect their awareness and productivity. Our number one goal <br />when working with our clients is satisfaction through successful project delivery. We strive to identify <br />risks early in the process and develop ways to mitigate these risks. We work closely with our clients <br />to keep them informed on the status of their project and any pending decisions, and we are extremely <br />responsive to their needs. <br />Quality Control/Quality Assurance <br />Dokken Engineering and our Team members are committed to the City in delivering project documents <br />whose quality exceeds the Industry standards. Quality is not just a priority; it is one of our core values. <br />We will implement a project -specific Quality Control Plan from the outset and QA/QC procedures will <br />be implemented in accordance with the project Scope of Work and general requirements of the RFP. <br />We understand that plan checks will be provided by the City of Santa Ana's Engineering Division and <br />the Orange County Fire Authority. Our procedures incorporate continuous product review cycles <br />during plan development, as well as a series of formal review procedures completed for major project <br />deliverables. The review of deliverables needed to satisfy the QA/QC procedure is built into our <br />proposed schedule. The flow chart below outlines our process. We take quality very seriously, as a <br />quality plan set provides the most competitive bidding opportunities for projects and helps keep <br />projects within their overall budgets, ultimately resulting in a high -quality project being built, on time, <br />and with minimal or no change orders. <br />R§DOKKEN Page 1 a <br />ENGINEERING <br />
The URL can be used to link to this page
Your browser does not support the video tag.