Laserfiche WebLink
MCFADDEN AVENUE PROTECTED BIKE LANE AND <br />BICYCLE BOULEVARD PROJECT <br />CITY OF SANTA ANA <br />®DOKKE N JENA ADDENBROOKE, PE <br />E N G I N E E R I N G UTILITY COORDINATION <br />•L Ms. Addenbrooke has 12 years of roadway design experience, <br />2008, BS Civil Engineering specializing in the area of utility coordination. She has an extensive <br />San Diego State understanding and complies with the FHWA's regulations and <br />University requirements under CFR governing utility relocations to ensure <br />proper and complete utility clearance prior to Right of Way <br />• certification. <br />California Professional EXPERIENCE <br />Civil Engineer, #C82544 Mid -Coast Corridor Transit Project, San Diego, CA I Associate <br />Utility Coordinator who assisted with coordination of dry utility <br />EXPERIENCE relocations. She was responsible for coordinating all utility designs <br />12 Years (with Dokken with the respective companies, ensuring relocations were compatible <br />since 2008) with the combined project plans, processing traffic control and right of <br />way permits for the utility owners, and providing construction support <br />AFFILIATIONS during relocations. <br />Women's Transportation E Palomar St Transit Station, Park & Ride and DAR at 1-805, <br />Seminar (WTS) Chula Vista, CA I Utility Engineer identified potential conflicts, <br />prepared pothole plans, monitored all activity in the field, and verified <br />utility conflicts for the project. She also prepared recycled water <br />project utility sheets in accordance with Otay Water District design <br />standards. Ms. Addenbrooke coordinated with utility companies, <br />construction managers, and design representatives to ensure <br />conflicts were identified and relocation designs were completed for <br />Caltrans utility certification. <br />R§DOKKENJAMIE FORMICO, SR/WA, R/W-NAC, R/W-RAC <br />E N G I N E E R I N G UPRR COORDINATION <br />• Ms. Formico has 19 years of right of way project management, real <br />2001, BS Criminal Justice property acquisition and relocation experience. She is an active <br />CSU Sacramento member of the International Right of Way Association, current Vice <br />Chair of the International Transportation Committee and past <br />REGISTRATION president for Chapter 27. She specializes in right of way project <br />California Licensed Real management, property acquisition, relocation assistance services, <br />Estate Broker, #01445531 public project management, and agreement preparation. <br />EXPERIENCE <br />California License Notary Green Tree Boulevard Extension, Victorville, CA I Ms. Formico <br />managed all right of way aspects of the project, including right of way <br />Relocation Certification, determination, ordering preliminary title reports, title research, plat <br />IRWA (R/W-RAC) maps and legal descriptions, property owner exhibits, document <br />preparation, right of way negotiations, railroad coordination, escrow <br />Negotiations Certification coordination, and right of way certification. The project is a roadway <br />IRWA R/W-NAC gap closure that connects Yucca Loma Road in the Town of Apple <br />EXPERIENCE Valley at the east end of the project with Hesperia Road and Green <br />Tree Blvd in the City of Victorville at the west end of the project. <br />19 Years (with Dokken Yucca Loma Bridge and Roadway Widening, Town of Apple <br />since 2014) Valley, CA I Right of Way Manager I Ms. Formico managed all right <br />of way aspects of the project, including right of way determination, <br />AFFILIATIONS ordering preliminary title reports, title research, plat maps and legal <br />International Right of Way descriptions, property owner exhibits, document preparation, right of <br />Assocations (SR/WA) way negotiations, railroad coordination, escrow coordination, and <br />right of way certification. <br />R§DOKKEN Page I A-5 <br />ENGINEERING <br />