Laserfiche WebLink
REVENUE ADOPTED <br />FY 20-21 <br />PROPOSED <br />FY 21-22 DEPT CHANGES <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br />SECTION IX PLANNING & BUILDING AGENCY <br />53600 111)Prelim Plan Check Review - per hour b)hourly 239.34 239.34 <br />53601 <br />53602 <br />53603 <br />53600 112)Energy PC - 4,000 sf.sq. ft.0.10 0.10 <br />53600 113)Energy PC - 8,000 sf sq. ft.0.10 0.10 <br />53600 114)Accessibility PC - 4,000 sf - Structural Plan Check sq. ft.0.18 0.18 <br />51601 115)Accessibility PC - 4,000 sf - Inspection sq. ft.0.06 0.06 <br />53600 116)Accessibility PC - 8,000 sf - Structural Plan Check sq. ft.0.10 0.10 <br />51601 117)Accessibility PC - 8,000 sf - Inspection sq. ft.0.05 0.05 <br />53600 118)Change of Use b)deposit 874.53 874.53 <br />53600 119)Code Modification - simple flat 955.06 955.06 <br />53601 <br />53602 <br />53603 <br />53600 120)Code Modification - moderate flat 1,910.14 1,910.14 <br />53601 <br />53602 <br />53603 <br />53600 121)Code Modification - complex flat 3,820.30 3,820.30 <br />53601 <br />53602 <br />53603 <br />53600 122)Notice of Violation - Structural Plan Check New hourly 239.34 239.34 <br />50