My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 29 - Proposed Fiscal Year 2021-22 City Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/01/2021 Regular
>
Item 29 - Proposed Fiscal Year 2021-22 City Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2023 4:32:07 PM
Creation date
8/21/2023 4:26:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
29
Date
6/1/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
979
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The Bristol Street Improvements project was planned and designed <br />to incorporate complete street concepts with storm water quality <br />features. The improvements include widening of the street from four <br />lanes to six lanes, with bus turnouts, raised median, bike lanes, <br />enhanced storm drain system, and sound walls. The project also <br />brings native and organic landscaping that beautifies a fully <br />developed urban area. <br />PROJECT NEED: <br />Bristol Street from Warner Avenue to St. Andrew Place (Phase 4) is <br />part of the City's plan to widen Bristol Street from Warner Avenue to <br />Memory Lane, which was approved by City Council in 1990 and <br />reevaluated in 2015. Existing roadway has only 2 lanes in each <br />direction and is operating at a LOS F. This widening is needed to <br />improve traffic flow and create complete streets features. <br />PROJECT TITLE: <br />Bristol Street Improvements and <br />Widening: Phase 4 - Warner to Saint <br />Andrew <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />AGENCY:CONTACT:DATE: <br />Public Works <br />DIVISION: <br />CIP Engineering Sean Thomas, Senior Civil Engineer 07-May-2021 <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 50,000 ------ <br />TOTAL 50,000 ------ <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />DAF: DA-IV 50,000 ------ <br />TOTAL 50,000 ------ <br />12
The URL can be used to link to this page
Your browser does not support the video tag.