Laserfiche WebLink
Task 2: Design Development (50% plans) <br />Design development will involve the schematic development of plans based upon the approved <br />conceptual design plan, which shall include architectural, landscape architectural, civil engineering, <br />and electrical engineering (including photometrics), draft technical specifications and "opinion of <br />estimated cost'. <br />➢ Deliverables shall include a 50% set of plans, draft specification and "Opinion of Probable <br />Cost'. <br />Task 3: Construction Documents (90% and 100%plans) <br />Construction Documents (CDs) shall include finalizing approved deliverables from the Design <br />Development phase. This includes the provision of detailed engineering and construction drawings <br />that will serve as the basis for both bidding and construction by a general contractor. <br />➢ Deliverables shall include 90% and 100% plans, final technical specifications, and a finalized <br />"Opinion of Probable Cost". <br />Plans shall include, but are not limited to the following: <br />• Title Sheet <br />• Civil Engineering <br />o Site Erosion Plan <br />o Parking Lot at Main Street with Gate, bollards <br />o Bike Trail <br />o Pedestrian Bridge <br />o Viewing Deck with seating area <br />o Park signage <br />o Concrete Walkways <br />o Decomposed Granite Walkways <br />o Horizontal and Vertical Control Plan <br />o Grading And On -Site Drainage Plan <br />o Site Utility Plan <br />• Landscape Architectural <br />o Site Layout/Construction Plans And Details <br />o Site Sections, as applicable <br />o Planting Plans/Details/Notes <br />o Irrigation Plans/Details/Calculations/Notes <br />• Electrical <br />o Electrical Site Plan, including lighting, electrical outlets <br />o Photometrics <br />o Location of panels, switchgear, meters <br />o Schedules <br />o Details <br />o Notes, specifications <br />City of Santa Ana RFP 20-154 <br />Page Al-3 <br />