My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Design Services for the Santiago Park Main Street Entrance Design Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
Item 16 - Design Services for the Santiago Park Main Street Entrance Design Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:27:38 PM
Creation date
8/21/2023 4:37:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
5/18/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Check & Permits: <br />Construction drawings shall be in accordance with the 2019 California Building Code and the <br />Americans with Disabilities Act and will require review/approval by the City Planning and Building <br />Agency. <br />As a condition of plan check approval, plans, specifications and structural calculations must be signed <br />by a California licensed architect / landscape architect / civil engineer as appropriate. <br />Construction drawings shall be submitted at 90% completion for constructability review by Public <br />Works Design Construction Engineering Divisions, and revised as directed. The 100% complete <br />construction drawing package will then be submitted for final City review to the following City <br />Agencies: <br />• Parks, Recreation and Community Services Agency <br />• Planning and Building Agency (Building, Electrical, Plumbing, SAPD) <br />• Public Works Agency <br />Drawings should be indexed and organized so they can be separated cleanly for individual reviews <br />by the Planning and Building Agency. The Public Works Agency Project Manager will coordinate <br />the submittal and review process. Once complete, the consultant will revise the Contract Documents <br />Technical Specifications <br />Technical specifications for all components listed above shall be provided by Consultant, or their <br />Sub -consultants, to the City in CSI (Construction Specifications Institute) format. City Staff will <br />combine these specifications with the City Boiler Plate Specifications which together, will become <br />the Project Manual. <br />Final Opinion of Prohahle Cost <br />Consultant shall provide updated opinion of probable construction cost which shall reflect finalized <br />plans, materials, systems, details of construction, and known or anticipated changes in the bidding <br />market relative to the project. Should project scope exceed available budget, project <br />plans/specifications will be phased as appropriate. <br />Task 4: Bid Advertisement, Construction Administration, Record Drawings: <br />Bid Advertisement <br />Consultant shall provide support to the City during the Bidding phase by assisting with <br />questions, requests for information/clarification, or conflicts arising out of the bidding <br />process. Consultant shall also attend pre -bid meeting, if scheduled. <br />Construction Administration <br />Consultant shall provide support to the City during the Construction Administration phase by <br />assisting with questions, requests for information/clarification, and reviewing submittals. <br />City of Santa Ana RFP 20-154 <br />Page Al-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.