My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/06/2021 Regular
>
Item 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:49:49 PM
Creation date
8/21/2023 5:15:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
4/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />r - � <br />PROPOSAL <br />PROJECT NO.: 17-6802 <br />LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK <br />ATPL-5063(177) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Wright Construction Engineering Corp <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Remove Chain -link <br />85 <br />LF <br />Fence / Gate <br />15.00 <br />1,275.00 <br />2 <br />Remove Sign <br />2 <br />EA <br />$ <br />$ <br />500.00 <br />1,000.00 <br />3 <br />Remove Tree <br />I <br />EA <br />$ <br />$ <br />2,500.00 <br />2,500.00 <br />4 <br />Clearing and Grubbing <br />I <br />LS <br />$ <br />30,000.00 <br />30,000.00 <br />5 <br />Remove Bollard <br />2 <br />EA <br />$ <br />500.00 <br />1,000.00 <br />6 <br />Adjust Water Valve <br />2 <br />EA <br />S <br />S <br />Box to Grade <br />350.00 <br />700.00 <br />7 <br />Adjust Survey <br />I <br />EA <br />$ <br />S <br />Monument Box to <br />1,000.00 <br />1,000.00 <br />Grade <br />8 <br />Adjust Sanitary Sewer <br />2 <br />EA <br />$ <br />$ <br />Manhole Lid to Grade <br />1,500.00 <br />3,000.00 <br />9 <br />Relocate Gas Line <br />EA <br />'300.00 <br />Warning Post <br />900.00 <br />10 <br />Remove / Abandon <br />1 <br />LS <br />$ <br />$ <br />Conflicting Irrigation <br />5,000.00 <br />5,000.00 <br />system <br />11 <br />Remove K-Rail <br />3 <br />EA <br />S <br />500.00 <br />1,500.00 <br />12 <br />Remove Vehicular <br />30 <br />LF <br />$ <br />x <br />Metal - Beam <br />25.00 <br />750.00 <br />Guardrail and Posts <br />P-1 of P-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.