My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/06/2021 Regular
>
Item 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:49:49 PM
Creation date
8/21/2023 5:15:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
4/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA REBI[ <br />PROPOSAL <br />PROJECT NO.: 17-6802 <br />LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK <br />ATPL-5063(177) <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />13 <br />Relocate Landscape <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />Boulders <br />14 <br />Remove Residential <br />60 <br />LF <br />Screen Wall (Includes <br />30.00 <br />1,800.00 <br />Gates and Fencing) <br />15 <br />Fine Grading <br />30,550 <br />SF <br />"1.00 <br />"30,550.00 <br />16 <br />Unclassified <br />713 <br />CY <br />60.00 <br />$ <br />42,780.00 <br />Excavation and Fill <br />with Excavated <br />Material <br />17 <br />Unclassified <br />790 <br />CY51.00 <br />40,290.00 <br />Excavation and Export <br />of Excavated Material <br />18 <br />Construct <br />9,565 <br />SF <br />$ <br />10.00 <br />95,650.00 <br />Decomposed Granite <br />Pathway with Organic <br />Binder (Includes <br />Aggregate Base <br />19 <br />Construct <br />730 <br />LF <br />$20.00 <br />14,600.00 <br />Decomposed Granite <br />Pavement Concrete <br />Header (Includes <br />Aggregate Base <br />20 <br />Construct Colored <br />780 <br />SF <br />S20.00 <br />15,600.00 <br />Concrete Pavement <br />(Includes Aggregate <br />Base <br />21 <br />Construct Asphalt <br />151 <br />SF <br />40.00 <br />6,040.00 <br />Concrete Pavement <br />(Includes Aggregate <br />Base <br />22 <br />Construct Concrete <br />75 <br />LF <br />$65.00 <br />$4,875.00 <br />Curb (Includes <br />Aggregate Base <br />23 <br />Construct Concrete <br />870 <br />LF <br />$ <br />60.00 <br />$ <br />52,200.00 <br />Curb and Gutter <br />(Includes Aggregate <br />Base <br />24 <br />Construct Concrete <br />85 <br />SF <br />$100.00 <br />8,500.00 <br />Cross Gutter <br />25 <br />Construct Concrete <br />371 <br />LF <br />$45.00 <br />S16,695.00 <br />Retaining Curb <br />26 <br />Install Detectable <br />45 <br />1 SF <br />$ <br />100.00 <br />'4,500.00 <br />Warning Surface <br />P-2 of P-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.