My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Flower Street Rehabilitation from McFadden Avenue to 1st Street Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
Item 22 - Flower Street Rehabilitation from McFadden Avenue to 1st Street Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:58:51 PM
Creation date
8/21/2023 5:24:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
3/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />https://www.santa-ana.org/pw <br />Item # {{item.number}} <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />March 16, 2021 <br />TOPIC: Flower Street Rehabilitation from McFadden Avenue to 1st Street Project <br />AGENDA TITLE <br />Award Construction Contract to All American Asphalt in the Amount of $305,598 for the <br />Flower Street Rehabilitation from McFadden Avenue to 1st Street Project with an <br />Estimated Project Delivery Cost of $648,000 (Project No. 21-6976) (Non -General Fund) <br />RECOMMENDED ACTION <br />1. Award a construction contract to All American Asphalt, the lowest responsible bidder, <br />in accordance with the base bid in the amount of $305,598, for construction of Flower <br />Street Rehabilitation from McFadden Avenue to 1st Street Project, for the term <br />beginning March 16, 2021 and ending upon project completion, and authorize the <br />City Manager to execute the contract subject to non -substantive changes approved <br />by the City Manager and the City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated construction delivery cost of <br />$648,000, which includes $305,598 for the construction contract, $61,120 for contract <br />administration, inspection and testing, and a $281,282 project contingency for <br />unanticipated or unforeseen work. <br />DISCUSSION <br />The City's Pavement Management Program identified Flower Street from McFadden <br />Avenue to 1 st Street as a high -priority area for street rehabilitation (Exhibit 1). Current <br />pavement conditions were field verified and it was determined the pavement has <br />deteriorated due to weather, age, and wear -and -tear from heavy vehicles. Project <br />improvements include the removal and replacement of failed asphalt pavement and the <br />replacement of damaged concrete curb, gutters, and sidewalks. Once completed, these <br />improvements will enhance the ride quality and visual appearance of the street in addition <br />to supporting local mobility of City residents. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, the City notified a total of <br />587 regional vendors via PlanetBids, many of which are Santa Ana based. Thirty -One <br />vendors requested bidding documents, and a total of five bids were received. Bids were <br />not received from any Santa Ana contractors. <br />
The URL can be used to link to this page
Your browser does not support the video tag.