My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Flower Street Rehabilitation from McFadden Avenue to 1st Street Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
Item 22 - Flower Street Rehabilitation from McFadden Avenue to 1st Street Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:58:51 PM
Creation date
8/21/2023 5:24:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
3/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Construction Contract to All American Asphalt for Project 21-6976 <br />March 16, 2021 <br />Page 3 <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2021-25 was filed for the project 21-6976 <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br />project is $648,000, which includes construction, contract administration, inspection, <br />testing, design engineering, and an authorized contingency of $281,282. <br />The following table summarizes the funds budgeted for expenditure to deliver <br />construction of this project. All Funds are available for expenditure in Fiscal Year 2020- <br />21. <br />Accounting <br />Fiscal <br />Unit - Account <br />Fund <br />Accounting Unit - <br />Amount <br />Year <br />No. <br />Description <br />Account No. Description <br />Project No. <br />EXISTING BUDGET <br />Gas Tax -Road Maintenance <br />2020-21 <br />05917665-66220 <br />Select Street <br />and Rehabilitation Account, <br />$648,000 <br />(21-6976) <br />Construction <br />Improvements Other Than <br />Building <br />Total <br />$648,000 <br />EXHIBIT(S) <br />1. Location Map <br />2. Bid Proposal <br />3. Construction Contract <br />4. Cost Analysis <br />Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency <br />Approved By: Kristine Ridge, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.