My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Warner Avenue Protected Bike Lanes ( Grand Avenue to Oak Street)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
Item 25 - Warner Avenue Protected Bike Lanes ( Grand Avenue to Oak Street)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 5:00:11 PM
Creation date
8/21/2023 5:25:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25
Date
3/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KimleY >>> Horn EXHIBIT A <br />Warner Avenue Protected Bike Lane (Oak Street to Grand Avenue) PS&E 211712021 <br />RFP NO. 20-094 <br />Scope of Services <br />The following Scope of Work will result in a separate bid package for a Class IV Bikeway in both <br />directions along Warner Avenue from Oak Street to Grand Avenue. Design plans and reports indicated <br />will follow the City's standard format, unless indicated otherwise. A drawing list indicating anticipated <br />sheet count is included as an attachment, and serves as a basis for our fee. We assume a 7-month <br />schedule for design beginning March 2021 with design services completed by October 2021. <br />Kimley-Horn will utilize the substantially complete Warner Avenue Improvements Phase 2A Plans from <br />Oak Street to Grand Avenue (Project No. 18-6901-C), hereafter referred to as the "Warner Avenue <br />Project," to create a separate set of bid documents for the Warner Avenue Protected Bikeway Project, <br />hereafter referred to as "Bikeway Project." This entails removing the bikeway elements from the <br />substantially completed Warner Avenue Project Plans and showing this information for the Bikeway <br />Project. We assume that the design of the bikeway will not change from what is currently shown in the <br />Warner Avenue Project Plans. In addition, we assume that the Warner Avenue Project will be <br />coordinated with the Bikeway Project. The street widening and other improvements as part of the <br />Warner Avenue Project will be constructed concurrently with the Bikeway Project. <br />Task 1: Project Coordination and Meetings <br />Kimley-Horn team members will attend one kick-off meeting to confirm project elements, objectives, <br />scope, and schedule; and attend PDT coordination meetings at each submittal (up to 2 meetings) with <br />the City. We will provide pertinent meeting minutes with action items and will prepare monthly <br />progress reports, as part of the invoice package. <br />Kimley-Horn will prepare a Gantt Chart format Target Schedule showing primary tasks and review <br />periods/processing, as agreed with the City. Kimley-Horn will maintain a Progress Schedule showing <br />actual progress versus target and provide to the City on a quarterly basis. <br />Deliverables: Meeting agendas, meeting minutes, action items, progress reports, invoicing, draft target <br />schedule, quarterly progress schedule. <br />Task 2: Record Research and Utility Coordination <br />Kimley-Horn will update record research data obtained as part of Warner Avenue Project and will obtain <br />readily available record drawings and data pertinent to the scope of services, such as GIS mapping, as - <br />built plans, and utility atlases. We will maintain a Utility Agency Tracking List and provide updates as <br />new information is received. In addition, we will prepare and send out the Final Notice to Relocate <br />letter. We assume that utility notices will be on the City's letterhead. Any utility agency fees are <br />excluded. <br />Deliverables: Utility agency tracking List, utility notification letters. <br />Task 3: Field Survey and Pothole Data <br />The Kimley-Horn Team will provide up to one day of supplemental field surveys to supplement field <br />surveys completed as part of the Warner Avenue Project. This entails obtaining topographic shots for <br />items such as street cross sections, features that present constraints and utility features (manhole dips, <br />valves, etc.). <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.