My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Warner Avenue Protected Bike Lanes ( Grand Avenue to Oak Street)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
Item 25 - Warner Avenue Protected Bike Lanes ( Grand Avenue to Oak Street)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 5:00:11 PM
Creation date
8/21/2023 5:25:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25
Date
3/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley>>> Horn <br />Warner Avenue Protected Bike Lane (Oak Street to Grand Avenue) PS&E 211712021 <br />RFP NO. 20-094 <br />The Kimley-Horn Team will also provide vacuum excavation potholes to positively identify utilities where <br />conflicts may exist. This task entails up to 3 potholes with a depth up to 15 feet. Additional potholes, if <br />needed, will be an optional item per each pothole. We assume traffic control for potholing will be based <br />on WATCH manual. Preparation of traffic control plans is excluded from this task. It is assumed that field <br />potholing operations will be performed and completed within a one -day period. <br />Deliverable: MicroStation V81 Files of Topographic Survey and Pothole Data Report <br />Task 4: Water Quality Management Plan <br />Kimley-Horn will update the Water Quality Management Plan (WQMP) for the project in compliance <br />with, and meeting the requirements of, Order No. R8-2009-0030 (Amended by R8-2010-0062), of the <br />Santa Ana Regional Water Quality Control Board. The WQMP will incorporate Low Impact Development <br />(LID) Best Management Practices (BMP) to the Maximum Extent Practical (MEP). Based on our <br />preliminary research traditional LID BMPs cannot be incorporated. Therefore, appropriate proprietary <br />BMPs will be selected to improve water quality. If proprietary items are needed, these will be indicated <br />in compliance with the City's adopted public contracting code. We will address one round of <br />consolidated City comments before preparing the final deliverable. <br />Deliverables: Draft and Final Water Quality Management Plan <br />Task 5: Street Improvement Plans <br />The Kimley-Horn will develop a street improvement plan for the construction of the protected bike lane <br />within the project limits. The plans will show typical sections, details and horizontal and vertical (where <br />needed) design information. Roadway plans will be prepared at a scale of 1" = 20' horizontal and 1"=2' <br />vertical. Vertical design information will be shown on plans with elevation call outs for details where not <br />shown on profiles. We assume the City will provide one set of consolidated comment for each submittal. <br />Deliverables: 30% and 100% Plans, electronic files in MicroStation V81 and PDF (final plans will be sealed <br />and signed), and responses to previous review comments from the City. <br />Task 6: Signing and Striping Plans <br />Kimley-Horn will prepare striping and signing plans at a scale of 1" = 40' for the proposed improvements <br />within the limits of the project. Signing and striping plans are limited to bikeway delineation. These will <br />comply with City's standards, Caltrans, and the California MUTCD. <br />Deliverables: 30% and 100% Plans, electronic files in MicroStation V81 and PDF (final plans will be sealed <br />and signed), and responses to previous review comments from the City. <br />Task 7: Opinion of Probable Construction Cost <br />Kimley-Horn will prepare an Opinion of Probable Construction Cost (Estimate) based on quantities, for <br />comparison to project budget and assistance during the Contractor's bidding process. Unit prices will be <br />derived from readily available current bid information based on similar projects within the area. Backup <br />will be generated for lump sum items. <br />Deliverables: 100% Opinion of Probable Construction Costs, electronic files in PDF. <br />Task 8: Specifications <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.