My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Warner Avenue Protected Bike Lanes ( Grand Avenue to Oak Street)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
Item 25 - Warner Avenue Protected Bike Lanes ( Grand Avenue to Oak Street)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 5:00:11 PM
Creation date
8/21/2023 5:25:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25
Date
3/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley>>> Horn <br />Warner Avenue Protected Bike Lane (Oak Street to Grand Avenue) PS&E 211712021 <br />RFP NO. 20-094 <br />Kimley-Horn will prepare technical specifications based upon the boiler plate supplied by the City. Bid <br />items will be described as reasonably required in the General Provisions and will be included in the <br />Contractor's bid list. References for the technical provisions to the City's Standards and Standard <br />Specifications for Public Works Construction (Greenbook), Caltrans, or other appropriate specifications <br />will be provided. We assume the City will compile all required forms for Federal Funding. <br />Deliverables: 100% Specifications, electronic files in PDF, (final Specifications will be sealed and signed). <br />Optional Items <br />Task 0.1: Bid Phase <br />Kimley-Horn will provide services during the bid phase by responding in writing to requests for <br />information (RFI)/clarifications. This consists of only making design changes determined necessary to <br />address clarifications. We have assumed up to two RFIs. Other design changes, such as those for the <br />contractor's preference, are not included in this scope. Changes in the overall design concept are not <br />accounted for in this scope. <br />Deliverables: Responses to up to two RFIs. <br />Task 0.2: Construction Support <br />Kimley-Horn will assist the City during the construction phase by responding to the Contractor's RFls, <br />preparing addenda, and providing clarifications. Changes in the overall design concept are not part of <br />this scope. A 12-month construction duration is assumed. We have assumed up to three RFls, up to five <br />contractor submittal reviews, one field observations, and up to one addendum. We will prepare record <br />drawings by updating the approved design drawings based on one set of redline markups provided by <br />the City. Independent verification is not included in this scope. Significant deviations from the original <br />design documents are not accounted for in this scope. The purpose of the record drawings is to create a <br />deliverable that will represent the built condition for the City's records, as record by the Contractor. <br />Deliverables: Responses to up to three RFls, five contractor submittals, design revisions for one <br />Addendum and Record Drawings - One hardcopy and one electronic file (PDF format and MicroStation <br />V80. <br />Exclusions: <br />1. Agency Fees <br />2. Copies/Reproduction <br />3. Traffic Phasing Plans <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.