My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - As-Needed HVAC Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
Item 27 - As-Needed HVAC Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 5:02:53 PM
Creation date
8/21/2023 5:26:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
3/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Check and use boiler viewport to check main burner flame as required. <br />5. Turn off and secure boiler as required. <br />6. Check boilers for any unusual noise or vibration as required. <br />7. Inspect gaskets for any signs of leaks as required. <br />8. Examine the venting system as required. <br />9. Remove and / or inspect gas pilot assembly, reinstall in accordance according to <br />factory specifications and tolerances. <br />10. Check boiler circulating pumps for proper operation and lubricate as required. <br />11. Check flame safeguard control for pilot and main flame ignition as required. <br />12. Check operation of blower motor and circuitry as required. <br />13. Check operation of gas valves and vents as required. <br />14. Inspect and tighten all electrical connections as required <br />15. Check and adjust all boiler limit pressure controls and running interlocks as required. <br />16. Check operation and adjust low water controls as required. <br />17. Check burner, pilot and main flame ignition as required. <br />18. Check and oil combustion air fan as required. <br />19. Check expansion tank and site glass as required <br />20. Check and record all entering and leaving water temperatures and pressures as required. <br />21. The equipment room shall be left in the same clean condition as existed prior to start of <br />the work. <br />22. Refer to equipment O&M manual for any maintenance clarifications. <br />Cooling Tower: <br />1. Provide four (4) quarterly inspections and maintenance. <br />2. Preventive maintenance as required. <br />3. Lock -out and Tag -out equipment as required. <br />4. Check starter contacts for excessive wear as needed. <br />5. Tighten all starter wire connections. <br />6. Check gear reducer and couplings. <br />7. Meg -Ohm motor and VFD's. <br />8. Check fan balance and motor(s) amps. <br />9. Clean and lubricate unit motor bearings and fan blades. <br />10. Check operation of media and flow. <br />11. Lubricate all dampers and linkages as necessary. <br />Chilled Water Pumps: <br />1. Check pump and motor operation. <br />2. Check fault history report as required. <br />3. Check and operate bypass valves. <br />4. Checks and verify strainers for optimum flow. <br />5. Check and tighten all electrical connections as required. <br />6. Check starter contacts for wear as required. <br />7. Check and record motor amp. <br />8. Lube and grease motor bearings as needed. <br />Johnson Controls: <br />1. Inspect and repair NCU 1 to NCU 12 for optimum operations. <br />2. Inspect and repair as needed 21 air handler controls and 46 VFD. <br />3. Inspect all damper motors controls and set points. <br />
The URL can be used to link to this page
Your browser does not support the video tag.