Santiago Park Gas House Area Development Project <br />March 2, 2021 <br />Page 3 <br />An analysis performed by staff on the bid received by Caliba, Inc. revealed that the <br />references provided by Caliba do not conform to the bid instructions. Those instructions <br />require bidders to list a minimum of three references to assure that prospective <br />contractors have sufficient experience performing similar work for public agencies. City <br />staff cannot consider deviations to this requirement as minor or inconsequential, and <br />therefore the bid from Caliba, Inc. is recommended to be considered non -responsive. <br />Staff received a Bid Protest on this project, and per the instructions contained in the bid <br />document, a hearing was held by the Public Works Agency with the Public Works Director <br />serving as the hearing officer. The protest was rejected as moot given that the protesting <br />party, upon a bid analysis by staff, was determined to be the lowest responsible bidder, <br />and the bid being protested was recommended for rejection. The basis of the bid protest <br />coincides with the staff analysis for rejecting the Caliba, Inc. bid. <br />The added time needed to analyze bids and hold the protest hearing has delayed the <br />award of this project from the potential award date in early February 2021 to March 2, <br />2021. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen <br />conditions. Construction administration and inspection includes construction <br />management; implementation of the City's Community Workforce Agreement <br />requirements; inspection of the Contractor's work to ensure contract compliance, <br />workmanship, and quality; and materials testing. As indicated in the Cost Analysis <br />(Exhibit 4) and as summarized in the table below, the estimated total construction delivery <br />cost of the project is $2,663,857. <br />Project Item <br />Total <br />Construction Contract <br />$2,143,418.60 <br />Construction Administration, Inspection, Testing <br />$310,438.40 <br />Contingencies <br />$210,000.00 <br />Total Construction Delivery Cost <br />$2,663,857.00 <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2019-59 was filed for the project <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br />project is $2,663,857, which includes construction, contract administration, inspection, <br />