My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Solutions for Congested Corridors Program
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/02/2021 Regular
>
Item 22 - Solutions for Congested Corridors Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 1:48:24 PM
Creation date
8/22/2023 7:47:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
3/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Santa Clara Bicycle and Pedestrian Improvements - $3.243 million <br />• Bus Stop Improvements on Routes:53/55B (Bravol Main: Street)=$0.344 million <br />The'totalBCCP program award remains the same. <br />Technical Changes <br />Bravo! Main Street— Five.Zero-Emission Buses <br />• Change from hydrogen fuel-celltobattery electric. With the changes in the State mandates, OCTA <br />needs to accelerate testing between,ze'ro-emission technologies. There.ls no impact to benefits. <br />as battery -electric buses are.still zero -emission. <br />Project Programming Requests Updates <br />Warner Avenue Signal Synch'ror ization'=.$4.092 million <br />• Updates to schedule to match allocation', contract award, and actual CECQA filing, <br />• Updatestothe Project Manager/Contacts: Original Project Manager retired. <br />• Add "Oesign-Build" in scope. This projectwas approved as,a design build in the application, <br />Edinger Avenue.Signal Synchronization - $4.957 million. <br />4t Updates toschedule'to match allocation, contract award, and actual CEOA filing. <br />• Updates to the Project Manager/Cuntacts, Original Project Manager retired.. <br />• Add "O'esign-Build." In scope. This proj'ecfwas approved as'a design build in the application: <br />MacArthur BaUievard/Talbert Avenue Signal Synchronization -$2'.951 Million <br />• Updates to schedule tp.match. allocation, contract. award, and actual MA fling. . <br />• Updatosto the Project Manager/Contacts, Original Project Manager retired. <br />o Add "Design -Build" in scope, This project was approved as.a design build in the application. <br />Bravol Main Street— rive Zero Emission Buses - $4.330 million <br />• Updates.to scope from Hydrogen FuekCell,to Battery -Electric. <br />Updates schedule to advance project, <br />• No Changes to benefits as both fuel types are zero -.emission. <br />Add the following Project Programming Requests, <br />* Santa Clara Bicycle.and Pedestrian Improvements - $3.2.43 million <br />• Bus Stop Improvements on Routes Main Street) - $0,344 million' <br />
The URL can be used to link to this page
Your browser does not support the video tag.