Laserfiche WebLink
City of Santa Ana, Public Works Agency <br />South Main Corridor Improvements Project <br />Construction Management and Inspection Services, RFP No. 20-115 <br />Table 1. Special Concerns / Suggestions (Continued...) <br />Constructability <br />Objective: Engage an <br />experienced CM team to <br />perform constructability <br />reviews relating to critical <br />change orders during <br />construction operations. <br />Safety <br />Objective: Perform a <br />comprehensive evaluation <br />of street corridor safety <br />issues. Engage local <br />merchants7 residents, and <br />local school administrators <br />to offer input on developing <br />a plan that facilitates <br />construction phasing and <br />safe practices for the public. <br />Community / <br />Environmental Impacts <br />Objective: Ensure local <br />stakeholders are informed of <br />the project impacts. Engage <br />local merchants, residents, <br />and local school <br />administrators to offer input <br />on developing mitigation <br />strategies for noise, dust, <br />and traffic deliveries. <br />Traffic Control <br />Objective: Confirm local <br />stakeholders are informed of <br />potential changes in traffic <br />patterns, detours, closures. <br />• Provide an independent team <br />to perform reviews <br />• Provide input and respect <br />Engineer's design approach <br />• Confirm project sequencing <br />requirements are addressed in <br />Contract Documents <br />• Attend Contractor's weekly <br />safety meeting. Follow and <br />respect Contractor's safety <br />program <br />• Active evaluation of traffic <br />control and site construction <br />operations staging <br />• Evaluation of construction work <br />zone staging <br />• Monitor trench zone work safety <br />• Active management of <br />pedestrian, resident, and <br />business access during <br />construction operations <br />• Enforce hours of work, noise <br />levels, and clean work areas <br />• Advise construction personnel <br />of community relations <br />responsibilities <br />• Proactive Community Outreach <br />• Timely project updates to local <br />stakeholders. <br />• Develop an Active <br />Management Plan with City, <br />Contractor, and local interests <br />• Integrate Contractor Traffic <br />Management Plan into the <br />community outreach <br />• Confidence in constructability <br />reviews to identify ambiguities <br />and conflicts <br />• Lower construction costs, <br />reduced change orders/claims <br />and fewer delays <br />• Mitigate/eliminate impact to <br />stakeholders on concurrent <br />construction activities <br />• Active management of <br />Contractor Site Safety <br />procedures <br />• Provide City front line <br />management with residents, <br />businesses, commuters, and <br />public <br />• Illness and injury free <br />construction site <br />• Minimize environmental <br />impacts to the local community <br />• Minimize community <br />complaints and possible <br />complications from access for <br />residents and businesses <br />• Mitigate changes to <br />construction phasing to <br />accommodate community <br />demands <br />• Provide an effective public <br />interface for traffic and access <br />control while maintaining a <br />detailed line of communication <br />with City staff/management <br />• Manage minimal disruption to <br />resident and business access <br />• Maintain maximum traffic flow <br />and worker's safety <br />BUTIERg 9 oK C. UNDERSTANDING OF NEED <br />