My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Approve Agreement for Construction Management for the South Main Street Corridor
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 12 - Approve Agreement for Construction Management for the South Main Street Corridor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:02:35 PM
Creation date
8/22/2023 9:19:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, Public Works Agency <br />South Main Corridor Improvements Project <br />Construction Management and Inspection Services, RFP No. 20-115 <br />Table 1. Special Concerns / Suggestions <br />Schedule Control <br />Objective: Implement <br />proposed project according <br />to its schedule and any <br />constraints. <br />Quality Control <br />Objective: Follow QC <br />guidelines to minimize <br />rework that could result in <br />schedule delays. <br />Cost Control <br />Objective: Utilize and follow <br />cost control management <br />strategies to keep project <br />within budget. <br />Stakeholder Coordination <br />Objective: Be responsive to <br />project stakeholder <br />coordination requirements to <br />achieve a high confidence <br />level for project success. <br />Team Cohesiveness <br />Objective: Maintain a <br />streamlined team that works <br />well together during CM and <br />inspection activities. <br />• Review Program Schedule <br />during pre -construction phase <br />• Conduct Schedule Workshops <br />regarding project constraints <br />with stakeholders <br />• Follow proven Butier QA/QC <br />plan with experienced <br />inspection staff <br />• Document work activities and <br />distribute to CM members daily <br />• Ensure contractor redlines are <br />updated on a weekly basis <br />• Provide CM/Field Engineering <br />budget linked to resource - <br />loaded construction baseline <br />schedule <br />• Quantify and negotiate PCOs <br />to ensure contingent costs are <br />reported to management <br />• Provide proactive alternatives <br />to construction sequencing <br />• Utilize document control tools <br />for 24/7 team access <br />• Participate in any partnering <br />workshops proposed by City <br />• Hold issue specific team <br />meetings / workshops <br />Provide a locally -based team <br />that has worked well together <br />on similar projects <br />Build from recent CM and <br />inspection activities for other <br />similar projects <br />Provide local team that is <br />familiar with local issues and <br />contractors <br />Identification of key schedule <br />constraints early on to mitigate <br />potential delays <br />Minimized cost overruns due <br />to unforeseen construction <br />issues <br />• Meet schedule with fully - <br />functional facility <br />• Concise 3-week look -ahead <br />• Streamlined sequencing & <br />coordination <br />• Minimize inspection costs <br />• Provide City staff with current <br />summarized data weekly. <br />Create Management <br />"dashboard" for interface with <br />field CM team <br />• Maintain a "no surprises" <br />result when planning progress <br />payments or approval of PCOs <br />• Provide a monthly report <br />detailing progress & delineate <br />project risk <br />• Facilitated, yet secure <br />document filing system for <br />detailed project progress <br />• Streamlined communications <br />and accountability for project <br />success <br />• Established plan for <br />maintaining stakeholder <br />involvement <br />Adaptive CM and inspection <br />team that is near the project <br />site <br />Proven integration of our <br />combined Team's CM and <br />inspection expertise <br />Team with knowledge of <br />urrent bidding climate <br />BUTIERg 9 oK C. UNDERSTANDING OF NEED <br />
The URL can be used to link to this page
Your browser does not support the video tag.