My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ELS ARCHITECTURE AND URBAN DESIGN
Clerk
>
Contracts / Agreements
>
E
>
ELS ARCHITECTURE AND URBAN DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:48:40 PM
Creation date
9/6/2023 3:36:47 PM
Metadata
Fields
Template:
Contracts
Company Name
ELS ARCHITECTURE AND URBAN DESIGN
Contract #
A-2023-150
Agency
Public Works
Council Approval Date
8/15/2023
Expiration Date
8/14/2026
Insurance Exp Date
10/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d) Electronic files for all CADD (in Microstation V8i), reports, and calculations shall <br />be submitted at the end of the contract or when requested by the City. <br />e) All electronic software developed, databases generated, spreadsheets and intellectual <br />properties developed during the life of the Agreement shall become the properties of <br />the City. <br />2. Deliverable PS&E package: <br />a) Task 1: 30% PS&E (Preliminary Design/Concept Planning) <br />This preliminary design phase shall include Kick-off meeting with City Staff to discuss <br />project background, building program, project goals and objectives, potential elements and <br />issues, schedule, review of existing information, and conduction of a site investigation. The <br />concept design process shall include gathering community input, via neighborhood <br />meetings. Consultant should provide allowance for up to (3) commmmity meetings and <br />(3) concept plans. <br />b) Tasks 2 & 3: 60% (Design Development), <br />90% & 100% PS&E (Contract Documents) <br />i. Plan Package shall include, but is not limited to: <br />ii. Design Development (60%); Task 2: <br />Design development phase will involve development of plans based upon the <br />approved conceptual design plan. Deliverables from this phase include, but are <br />not limited to, site planning, architectural, civil engineering, HVAC and <br />electrical engineering. This phase shall also include draft outline specification <br />and `opinion of estimated cost'. <br />iii. Contract Documents (90% and 100%); Task 3: <br />Construction Documents phase (CDs) shall include preparation of plans and <br />specifications for Contract Documents, based upon the approved drawings from <br />the Design Development phase, and a finalized "Opinion of Probable Cost". <br />iv. The Consultant shall submit the following documents for review and approval: <br />Plans, Standard Special Provisions (SSP), preliminary quantities and <br />estimates, pay item list, design calculations and all reports supporting the <br />design (i.e. irrigation calculations). <br />V. Constructability review meeting shall take place at 90% and shall include <br />Consultant and City engineering staff. <br />A. Codes and Permitting: Aquatics facility design shall comply with the 2023 US <br />Department of Health and Human Services Model Aquatic Heath Code. <br />Construction drawings shall be in accordance with the latest adopted <br />City of Santa Ana RFP 23-061 <br />Page Al-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.