Laserfiche WebLink
CITY OF SANTA ANA <br />Prieparer: AV <br />Reviewer: GC <br />Project No,: 22-6989 <br />Date Revised: 05/30/23 <br />Date Reviewed; <br />EXHIBIT B - TABLE I <br />COST ESTIMATE-SANTA ANA <br />22-6989 - Westminster Avenue Rehabilitation <br />Newhope St to Harbor Blvd <br />M Mm "0. K -.'-k� <br />R Rlfi3.''�95 <br />Eq C, N <br />@RER- <br />�Ka <br />Qq MTTUIYVI_I��- <br />'N <br />I <br />Unclassified Excavation <br />CY <br />870 <br />a W$ 243,600.00 <br />2 <br />Asphalt Concrete <br />TN <br />1,240 <br />$ 248,000,00 <br />3 <br />Cold Mill (2") <br />SF <br />178,000 <br />r $ 178,000.00 <br />4 <br />Asphalt Rubber Hot Mix (ARHM) <br />TN <br />2,500 <br />$ 650,000.00 <br />5 <br />PCC Sidewalk (T=4") <br />SF <br />5,800 <br />81,200.00 <br />6 <br />PCC DrivewM Approach (T�8") <br />SF <br />1,100 <br />$ 27,500.00 <br />7 <br />PCC Curb Ramp <br />SF <br />'800 <br />$ 14,400.00 <br />8 <br />PCC Curb and Gutter (Type A-2-8) <br />LF <br />500 <br />$ 25,000.00 <br />9 <br />PCC (13-1) Curb (Including Steel Rebar Dowels) <br />LF <br />100 <br />$ 2,500.00 <br />10 <br />Root Shave* <br />EA <br />5 <br />$ 3,300.00 <br />I I <br />Adjust Water Valve Frame and Cover Per CSA <br />STD, <br />EA <br />22 <br />9 $ 24,200,00 <br />12 <br />Adjust Water Vault Frame and Cover Per CSA <br />STD, <br />EA <br />1 <br />$ 1,600,00 <br />13 <br />Adjust Water Meter Frame and Cover Per CSA <br />STD. <br />EA <br />6 <br />$ 4,800,00 <br />14 <br />1 Adjust Manhole Frame and Cover Per CSA STD, <br />EA <br />23 <br />$ 27,600,00 <br />15 <br />Adjust Manhole Frame and Cover Per OCFCD <br />STD, <br />EA <br />3 <br />$ 6,000,00 <br />10 <br />Parkway Culver Type B <br />EA <br />2 <br />$ 800,00 <br />17 <br />Furnish and Install New #6 Pullbox <br />EA <br />4 <br />$ 4,400.00 <br />18 <br />Adjust Survey Monument Frame and Cover <br />EA <br />2 <br />a $ 4,000.00 <br />19 <br />Furnish and Install Traffic Loops Ty" D t <br />EA <br />28 <br />$ 14,000.00, <br />20 <br />Furnish and Install Traffic Loops Type, E t <br />EA <br />56 <br />E $ 28,000.00 <br />21 <br />Furnish and Install Traffic Loops Type Q 'I' <br />EA <br />2 <br />& $ 1,000.00 <br />22 <br />Project Advertisement Sign <br />EA <br />1 <br />$ 1,000.00 <br />23 <br />Signing and Striping <br />LS <br />I <br />$ 39,200.00 <br />24 <br />As -Built Plans <br />LS <br />I <br />$ 3,500,00 <br />23 <br />Construction Permits <br />EA <br />I <br />. . . . . . . . . ..... 7,000.00 <br />"M <br />- ' ..y AS <br />_�U_ <br />Contingency <br />10% $ 164,000.00 <br />Construction Engineering <br />Wnk fit t q "X <br />8., <br />15% $ 246,000.00 <br />5 7 7 <br />City Council 12-14 9/19/2023 <br />