My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-09-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
09/19/2023 Regular
>
Agenda Packet_2023-09-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2023 3:47:31 PM
Creation date
9/18/2023 8:22:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/19/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
843
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />Preparers AV <br />Reviewer: GC - Nick Hsieh <br />Project No.: 22-6989 <br />Date Revised: 05 30/23 <br />Date Reviewed: <br />EXHIBIT B - TABLE 2 <br />COST ESTIMATE- GARDEN GROVE <br />22-6989 - Westminster Avenue Rehabilitation <br />Newhope St to Harbor Blvd <br />1 <br />Wo� air <br />Unclassified Excavation <br />CY <br />170 <br />$ 47,600.00 <br />2 <br />Asphalt Concrete <br />TN <br />210 <br />$ 42,000.00 <br />3 <br />Cold Mill (2") <br />SF <br />35,000 <br />$ 35,000.00 <br />4 <br />Asphalt Rubber Hot Mix (ARHM) <br />TN <br />500 <br />$ 130,000.00 <br />5 <br />PCC Sidewalk (T= 4") <br />SF <br />1,400 <br />_ - $ 19,600,00 <br />6 <br />PCC Curb Ramp <br />SF <br />1,000 <br />;r $ 18,000.00 <br />7 <br />Truncated Domes <br />EA <br />3 <br />S 4,500.00 <br />8 <br />PCC Curb and Gutter (Type A-2-8) <br />LF <br />300 <br />- $ 15,000.00 <br />9 <br />Furnish and Install Water Valve Lid and Slip Can <br />Per GG STD <br />EA <br />26 <br />e $ 31,200.00 <br />10 <br />Adjust Manhole Frame and Cover Per GG STD. <br />EA <br />2 <br />$ 4,000,00 <br />11 <br />Adjust Manhole Frame and Cover Per OCSD STD, <br />EA <br />2 <br />$ 4,000,00 <br />12 <br />Furnish and Install Manhole Per GG STD, <br />EA <br />1 <br />". , $ 2,500.00 <br />13 <br />Install FABCO CPS Unit <br />EA <br />5 <br />3 ; �. $ 8,000.00 <br />14 <br />Catch Basin Top Slab Reconstruction <br />LS <br />1 <br />SIR`. $ 10,000,00 <br />15 <br />Project Advertisement Sign <br />EA <br />1 <br />$ 1,000.00 <br />16 <br />Signing and Striping <br />LS <br />1 <br />Q $ 13,000.00 <br />17 <br />As-BuiltPlans <br />LS <br />] <br />$ 1,500.00 <br />„s <br />..:t:Si^:iS <br />e y.a .. _ «.-"e <br />i�'A)(,W, _-.,LtTGTL01:G.:. :W`P <br />- .d f <br />H.>>�;-beds: <br />.., ...:4 .., .°,$...8;906 {1: <br />Design Engineering <br />15% $ 58,000.00 <br />Contin envy <br />10% $ 39,000.00 <br />7777—.:3i�f.°f'SvYMr <br />f3.,..m_.,m <br />Construction Engineering <br />T e li <br />, <br />City Council 12 — 15 9/19/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.