My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-10-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Agenda Packet_2023-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 9:17:39 AM
Creation date
9/28/2023 8:31:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of Need / Scope of Work ;} - <br />Data management will be performed in-house at our Oceanside office. At the completion of the <br />project, the StreetSaver database will be verified and Bucknam will ensure that staff has access <br />to it through StreetSaver online services. <br />3. Section Distress and PCI Reporting <br />Once inspections are completed, we will generate a draft Pavement Condition Index (PCI) <br />Report for City staff to review. <br />PCI reports will include the necessary data listed within the Countywide Pavement <br />Management Program, Guidelines Manual; Chapter 3 (Agency Submittals). <br />At a minimum, the Santa Ana Pavement Condition Index (PCI) Report will include: <br />• Present condition index per segment, per rank, per maintenance zone and citywide <br />• Present condition of segments and future performance for the next seven years <br />based on performance prediction modeling and local conditions <br />• Identify distress percentages of Load, Climate and Other categories <br />Deliverable: Citywide draft PCI report, Pavement segment data required within PMP <br />Guideline Manual (OCTA) <br />TASK 2.3: Budgetary Analysis <br />Bucknam will review all city provided maintenance/rehabilitation projects that have been <br />completed since the last major PMP update (i.e. June 2022) as well as a listing of "scheduled" for <br />M&R over the next seven years. These records will be assessed and entered into StreetSaver. <br />Our staff will generate an updated work history report for City review and compliance. <br />We will assist the City in developing the most cost-effective preventative maintenance, <br />rehabilitation and reconstruction strategies possible. This will be accomplished by meeting with <br />the City to discuss and strategize maintenance activities that are currently being used by the City. <br />Based on the City's current AC & PCC applications and other alternative M&R practices used we <br />will conduct an historical and prospective analysis on the conditional and financial impact these <br />current practices have on the pavement network. Based on our fiscal and deterioration analysis, <br />we will present our results and recommendations to City staff. This analysis will become an <br />essential building block for the 2024-2031 fiscal year maintenance/rehabilitation programs. <br />We will establish/update a M&R "decision tree" that will be used to generate pavement <br />recommendations that match current 2023-24 practices. This will be accomplished by <br />assessing/updating the unique and individual deterioration curves within StreetSaver based on <br />functional class (i.e. arterial, collector, local), traffic volumes and age. <br />Our staff will review the Santa Ana's deterioration curves that have been developed based on <br />historical pavement condition, inspection, surface type, StreetSaver deterioration, and road class. <br />3-5 <br />City Council 9 -11 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.