Laserfiche WebLink
Appeal Application <br />Fourth Street) <br />October 3, 2023 <br />Page 11 <br />Nos. 2023-02 and 2023-03 for Cabrillo Town Center project (1901 E. <br />Finding <br />Project Compliance <br />harmonious operation as specified in <br />Section 7 of the MEMU. <br />and nonresidential uses. On -site lighting will be consistent with <br />Chapter 8 of the SAMC. <br />Tentative Tract Map <br />Subdivision requests are governed by Chapter 34 and Chapter 41 of the SAMC. <br />Pursuant to Section 66473.5 and 66474 of the California Subdivision Map Act, <br />applications for tentative tract maps are approved when it can be shown that findings <br />can be made in support of the request. <br />Specifically, findings related to the proposal need to be made that find the project is <br />consistent with the General Plan, the site is physically suitable for the type and density <br />of the proposed project, the proposed project will not cause substantial environmental <br />damage or substantially and avoidably injure fish and wildlife or their habitat, the <br />proposed project will not cause serious public health problems, or the proposed project <br />will not conflict with easements necessary for public access through or use of the <br />property must be made. Using this information staff has prepared the following <br />analysis, which, in turn forms the basis for the recommendation contained in this report. <br />In analyzing the applicant's request, staff believes that the following analysis warrants <br />approval of the tentative tract map. <br />The applicant is seeking approval of a tentative tract map (County Map No. 19243) to <br />create two legal lots, one of which will be subdivided for condominium purposes for the <br />townhome portion of the site. Upon completion of the subdivision, the lots will continue <br />to be utilized for residential use in the form of attached tuck -under unit type structures <br />(townhouse development), and commercial/residential mixed -use (wrap building). In <br />reviewing the project, staff determined that the proposal as conditioned is consistent <br />with the various provisions of the City's General Plan. As an SB 330 application, the <br />proposed development has been found to be consistent with the objective general plan <br />standards for the property. <br />Further conditions of approval have been included to ensure the site's landscaping, <br />architectural design, and Covenants, Conditions, and Restrictions (CC&Rs) continue to <br />be in compliance with all applicable standards of the SAMC and the MEMU in the <br />future. Further, no adverse environmental impacts to fish or wildlife populations were <br />identified as the project site is located in a built -out, urbanized area. The project will also <br />maintain all required easements. Finally, the tentative tract map was found to be <br />consistent with the California Subdivision Map Act and Chapter 34 of the SAMC. <br />Public Notification and Community Outreach <br />Project notifications were posted, published, and mailed in accordance with City and <br />State regulations for both the Planning Commission hearing and the City Council appeal <br />hearing. In addition, staff contacted the provided contacts for the Lyon Street and <br />Mabury Park neighborhood associations to ensure they were aware of the project and <br />City Council 18 —11 10/3/2023 <br />