Laserfiche WebLink
Appeal Application <br />Fourth Street) <br />October 3, 2023 <br />Page 9 <br />Nos. 2023-02 and 2023-03 for Cabrillo Town Center project (1901 E. <br />Appeal Application No. 2023-03 (SWMSRCC) <br />Pursuant to Section 41-645(a) of the SAMC, this appellant is requesting that the City <br />Council overturn the Planning Commission's decision approving SPR No. 2023-01 and <br />TTM No. 2023-03 and provides four main reasons to substantiate the request, including: <br />(1) Requirement of a local workforce; (2) Training requirements to prevent community <br />spread of COVID-19 and other infectious diseases; (3) CEQA compliance; and (4) <br />Inconsistency with the City's General Plan. <br />In addition, the City received a supplemental comment letter on August 17, 2023, from <br />Mitchell M. Tsai, on behalf of the SWMSRCC. Staff notes that this letter is outside of the <br />10-day appeal period, as outlined in Section 41-645(b) of the SAMC. Therefore, the <br />subsequent appeal items do not satisfy the requirements of SAMC Section 41-645 and <br />should not be considered. Nonetheless, staff has prepared a comprehensive response on <br />all appeal items received (original appeal letter and supplemental), which can be found in <br />Exhibit 10. <br />MEMU Site Plan Review <br />Pursuant to Section 41-595.5 of the SAMC and sections 2.3 and 8.1 of the MEMU, <br />approval of a Site Plan Review by the Planning Commission is require for any project <br />wishing to develop per the MEMU standards. In accordance with Section 8.2 (Findings <br />for Granting a MEMU Overlay Zone Site Plan Review Approval) an analysis of the <br />project's compliance with the MEMU is provided in Table 4 below. <br />Table 4: MEMU Findings for Site Plan Review Approval <br />Finding <br />Project Compliance <br />That the proposed development plan <br />The project will create a new mixed -use development within <br />is consistent with and will further the <br />close proximity to office buildings, Cabrillo Park, Mabury Park, <br />objectives outlined in Section 1.2 for <br />and less than two miles from Downtown Santa Ana, which <br />the MEMU. <br />provides additional opportunities to live, work, and play. The <br />proposed project includes two distinct market -rate housing <br />product types, including a townhouse development and mixed - <br />use residential development. Each townhouse building will be <br />three -stories in height, while the mixed -use building will be five - <br />stories with ground floor commercial/retail and residential units <br />on upper floors, wrapped around a 6.5-level parking structure. <br />The height of the buildings will blend in with the heights of the <br />nearby office buildings, which range from single -story, three- <br />story and eight -story buildings. <br />The project will be built to California Building Code standards, <br />which include energy and water conservation measures and <br />will improve pedestrian mobility by providing new sidewalks <br />and parkways along Fourth Street and Parkcourt Place. In <br />addition, the publically accessible linear park along Parkcourt <br />Place will serve as a link to the Cabrillo Park to the north. Each <br />residential unit will have storage opportunities for personal <br />City Council 18 — 9 10/3/2023 <br />