My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (9)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 4:11:59 PM
Creation date
10/4/2023 11:10:02 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2020-241-34-01
Agency
Planning & Building
Council Approval Date
12/1/2020
Insurance Exp Date
4/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mc Donald's at Santa Clara Avenue <br />Subtask 3.4 Mitigation Monitoring and Reporting Program <br />Through the course of IS/MND preparation, if mitigation measures are identified, in compliance with <br />Section 21081.6 of the California Public Resources Code, Psomas will prepare a Mitigation Monitoring <br />and Reporting Program (MMRP) as part of the Final IS/MND document. The MMRP will be prepared in <br />matrix format and will provide the timing and responsibility for each mitigation measure. It should be <br />noted that, later during the public hearings, if the Planning Commission or City Council modify the <br />Project and/or recommend standard conditions of approval/mitigation measures for the proposed Project, <br />Psomas will revise theMMRP. However, substantial modifications to the MMRP are not assumed in the <br />SOW and fees for this Project. <br />Subtask 3.4 Deliverables <br />Electronic Copy (email) of the Draft and Final MMRP <br />TASK 4 PROJECT MANAGEMENT, MEETINGS, AND PUBLIC HEARINGS <br />Subtask 4.1 Project Management <br />Psomas will be responsible for managing the CEQA process for the City. This includes ongoing <br />coordination with the City and Project team to ensure compliance with the SOW and schedule and to <br />ensure that information is disseminated, as necessary. <br />Subtask 4.1 Deliverables <br />• Project Management Duration of Project <br />Subtask 4.2 Proiect Meetings <br />This task includes attendance at up to two coordination meetings (virtual or in -person), as necessary, with <br />the City, the Applicant, and Project team (in addition to the Project Kick -Off meeting). This SOW <br />assumes that the Project Manager will attend all meetings (three hours each, which includes preparation <br />and travel time). Additional meeting attendance will be billed on a time and materials basis, based on <br />hourly rates and subject to prior approval. <br />Subtask 4.2 Deliverables <br />Two (2) Meetings with the City and Project team <br />Subtask 4.3 Public Hearings <br />Psomas will attendthe Planning Commission and City Council hearings for a total of two public hearings <br />(one Planning Commission and one City Council). Psomas will be available to provide advice and input <br />to the City and address questions regarding CEQA; the environmental review process; and the findings of <br />the IS/MND analyses, as appropriate. The preparation of visual aids for the public hearings are not <br />included in this SOW. This task assumes public hearings will be attended by the Project Manager and up <br />to two Psomas technical staff. The supporting staff in attendancewill be based on the issues that arise out <br />of the public review process. <br />Additional public hearing attendance will be billed on a time and materials basis, based on hourly rates <br />and subject to prior approval. <br />Subtask 4.3 Deliverables <br />• Two (2) Public Hearings —one (1) Planning Commission and one (1) City Council <br />reoaromaiaTlyorsaaaMawaoonald 8MND-m0123.aoox A-10 Cost Estimate <br />
The URL can be used to link to this page
Your browser does not support the video tag.